Map the complete route
Check road width, turning room, gate width, gradients, bridge or driveway limits, truck standing position and the route from street to final placement area.
Request Project PricingPools & Wellness · Cornerstone guide
The final pool position is only workable if the transport and lifting sequence can reach it safely. Delivery planning should happen before fences, landscaping and surrounding structures remove the access needed for the lift.

Check road width, turning room, gate width, gradients, bridge or driveway limits, truck standing position and the route from street to final placement area.
Crane capacity, radius, outrigger setup, ground bearing and lift method are determined by the appointed lifting provider for the actual site. Apollo can provide the current pool information needed to support that planning.
Power lines, trees, roofs, eaves, neighbouring structures and narrow side access can change the lifting strategy. Record them before the final delivery plan is agreed.
Foundation, clearances, equipment access and surrounding work should be ready for placement so the pool does not arrive before the site can receive it.
Reference this resource
Link to the live page rather than a saved copy so readers reach the current Apollo planning resource and its latest product and planning links.
apollonzglobal.com/knowledge-centre/pools-wellness/pool-delivery-crane-access-placement-guideApollo NZ Global. Pool Delivery, Crane Access & Placement Guide. apollonzglobal.com/knowledge-centre/pools-wellness/pool-delivery-crane-access-placement-guideReference & source policy Move from knowledge to project