Start with the delivery route and finished pool level — not the pool brochure.

Sloping, elevated, narrow-access and difficult sites can suit modular pools, but the project is only practical when support, retaining, delivery, crane reach, service access and surrounding works are resolved as one sequence. Auremont's standard-size approach makes those constraints easier to define early.

Auremont modular pool integrated into a hillside deck
Hillside · sloping · elevated sitesTruck + crane planning before deliveryAbove-ground · recessed · deck-integrated pathwaysProject-specific foundation + retaining

Project fit

Where this Auremont pathway makes sense.

The application determines what has to be coordinated early. The four standard pool sizes remain the product base; the project around them changes.

01

Hillside homes

A modular pool can sit above or into a slope where local structure, retaining and drainage are designed around the actual site.

02

Elevated decks

Deck-integrated pool concepts need independent load paths, access panels, drainage and final levels coordinated before the deck is closed.

03

Narrow urban access

Where direct vehicle access is limited, the lift path and crane radius can become the controlling project issue.

04

Retained sites

Partially recessed or inground arrangements require groundwater, retained-soil, drainage and inspection access to be solved locally.

05

Remote properties

Road condition, bridge limits, delivery vehicle access, unloading and contingency planning can matter more than distance alone.

06

Coastal slopes

Wind, salt exposure, crane setup, corrosion protection and access for future servicing all need to be considered together.

Project priorities

Resolve the constraints before the visual details.

Map levels, slope, retaining and the intended finished waterline before choosing the installation route.Check the road-to-site transport route, not just the final driveway.Have the lifting provider review crane setup, radius, obstacles and ground conditions against the configured pool.Do not complete decks, retaining walls, fences or landscaping in a way that blocks final placement.Keep drainage and groundwater away from support areas and equipment zones.Preserve access for pumps, filters, heaters, controls and any maintainable structural / hydraulic interfaces after the site is finished.

Standard size pathway

Use the current four Auremont formats as the starting point.

Published size references help match the project. Approved CAD still controls internal swimming dimensions, water depth, equipment zone, service clearances and final configured envelope.

01 · STANDARD FORMAT

Compact

4.0 × 2.0 × 1.4 m

Smallest current reference footprint for constrained sites

02 · STANDARD FORMAT

Compact Plus

4.3 × 2.25 × 1.4 m

Compact footprint with additional width

03 · STANDARD FORMAT

Mid-size

5.1 × 2.24 × 1.5 m

Balanced pathway where access + lift geometry allow

04 · STANDARD FORMAT

Long format

9.1 × 2.2 × 2.0 m

Requires stronger transport, crane and site-planning review

Relevant configuration pathways

Options should solve a project need.

Architectural, water-system and cover options are confirmed against the selected pool and project rather than assumed to fit every configuration.

Open Auremont Options Centre
01Above-ground installation02Partially recessed installation03Deck-integrated installation04Engineered inground pathway05Acrylic viewing window06Architectural exterior / WPC integration07Automatic cover08Sliding deck cover

Project sequence

Turn the application into a controlled supply brief.

AUREMONT is supply-only. Local foundations, lifting, utility connections, barriers, installation, regulated trade work and approvals remain project-specific unless expressly included elsewhere.

01

Survey the site relationship

Record slope, levels, retaining, access, nearby structures, utilities and proposed pool position.

02

Choose the closest standard Auremont size

Use the four current standard formats; do not redesign the shell around an impossible access route.

03

Test the delivery + lift pathway

Truck standing, crane setup, radius, overhead obstacles and final set-down route should be checked early.

04

Resolve local support + drainage

Foundation, retaining, groundwater and surrounding drainage follow the actual site and final project configuration.

05

Freeze levels + service access

Set the pool level, equipment access, deck openings and surrounding work before permanent finishes are completed.

06

Place before closing the site

Sequence retaining, fences, decks and landscaping so the configured pool can physically reach its final position.

Project planning example

Planning example · sloping holiday property

A hillside project might use the Mid-size Auremont as a partially elevated / deck-integrated pool. The key early decisions are not colour or furniture: they are final pool level, support strategy, downhill retaining / drainage, truck access, crane setup and whether the equipment bay remains serviceable after the deck and landscaping are complete.

Final levels firstFoundation by local teamCrane path protectedDeck follows pool placementEquipment access retained

International project pathway

Pool configuration and freight planning belong in the same brief.

For overseas projects, AUREMONT project review uses the destination, access, port / depot pathway, project timing and selected pool configuration supplied by the client and their local project team. Physical site inspection is not included. Site installation and statutory work remain local project responsibilities.

Move into project information review

Configure the standard pool, then submit the dimensions, drawings, photos, access and destination information available.

Need Apollo to review it?

Turn the result into a project brief.

Project