Skip to main content
Apollo NZ GlobalRequest Project Review
Apollo NZ Global/Weather Protection/Wildfire & Ember Protection

Wildfire & Ember Protection · break the ignition pathway early

Wildfire defence starts with the small things wind can carry to the building.

Embers can reach a property ahead of the main fire and accumulate at vents, gutters, roof corners, deck gaps, fences, stored materials and the base of walls. This category focuses on ember-entry and near-building protection rather than broad fireproof claims.

Wind Flood Fire Heat Outage
Modern firewise home with screened openings, clean roof edges and a noncombustible near-building landscape zone
Representative Weather Protection application · final product selection, design values and technical capacity remain project-specific.

Wildfire & Ember Protection · Key answers

What project teams need to know about Wildfire & Ember Protection.

Use these answers for early planning, then confirm exact technical and local-project requirements for the selected system.
01

What is Apollo's wildfire and ember-protection pathway?

The pathway focuses on reducing ember-entry and ignition connections around vents, roof edges, gutters, near-building surfaces, stored materials and other vulnerable interfaces before making broader fire-performance claims.

02

How are ember vents and mesh selected?

Ember vents and mesh are project-dependent rather than one-size products. Suitability depends on the opening, material, mesh aperture, fixing method and the local wildfire or bushfire requirements.

03

What information is needed for a wildfire-resilience review?

Useful inputs include the site and jurisdiction, building plans or photographs, roof and vent details, near-building materials and vegetation, access, water and power considerations, and any local wildfire or bushfire design requirements.

04

Who confirms final wildfire compliance?

Apollo can coordinate verified product pathways, but final wildfire or bushfire design, code compliance, siting and professional certification remain project- and jurisdiction-specific.

Protection pathways

Build the protection package around the actual exposure.

Available now

Wildfire Property Intelligence

Map the Home Ignition Zone and visualise ember → fuel → flame → building pathways across the property.

Open pathway
Available now

Wildfire Visual Guide

Use 10 illustrated education boards to understand Home Ignition Zones, ember pathways, roofs and vents, defensible space, Red Flag days, smoke continuity and recovery.

Open pathway
Available now

Wildfire Home Walkaround

Run a faster maintenance-oriented check across roof, vents, decks, fences, firewood, vegetation and access.

Open pathway
Available now

Wildfire Knowledge

Understand home ignition zones, defensible space, ember pathways, roof and vent vulnerabilities, Red Flag conditions and wildfire-aware outdoor fire use.

Open pathway
Available now

Smoke & Clean-Air Refuge

Coordinate one closable lower-load room around filtration, outdoor-air control, heat, power and communications for smoke events when staying indoors is appropriate.

Open pathway
Coming soon

Ember-Resistant Vents

Vent systems intended to preserve required airflow while reducing ember-entry pathways.

Coming soon

Ember Mesh & Screens

Selected screening products for vulnerable openings and interfaces.

Coming soon

Roof & Gutter Protection

Debris-management and protected-edge pathways that reduce ignition opportunities at the roof perimeter.

Coming soon

Noncombustible Perimeter Systems

Near-building surface and edge systems designed to reduce easy ignition bridges.

Planning pathway

Firewise Landscape Interfaces

Separation, maintained access and discontinuity around vegetation, fences, decks and storage.

Planning pathway

Heat + Smoke Refuge

Coordinate a closable, lower-load room with filtration, shade and essential power planning.

Open pathway
Planning pathway

Solar Control

Reduce refuge-room heat load so a smoke event does not force a conflict between clean air and overheating.

Open pathway
Planning pathway

Resilient Property Framework

Map the ember → fuel → flame → connected element → building pathway before buying products.

Open pathway
01Weather protection strategy

Treat wildfire resilience as a connected protection system.

A roof covering can perform well while dry debris in a corner, an open vent, combustible storage or a fence connection creates the actual ignition pathway. The useful question is: if this ignites, what can it ignite next?

02Weather protection strategy

The near-building zone should reduce easy ignition bridges.

Resilient design can use noncombustible or low-ignition surfaces, maintained separation, clean roof edges and deliberate spacing without turning the property into a barren landscape. Exact distances and materials remain jurisdiction-specific.

03Weather protection strategy

Vents must still perform their normal building function.

Blocking ventilation casually can trade ember protection for moisture or durability concerns. Vent and mesh selection therefore needs to consider airflow, the building system and local requirements together.

04Weather protection strategy

Wildfire resilience changes with the season.

Leaves return, vegetation grows, mulch migrates and storage moves. A good system includes inspection and maintenance rather than assuming a one-time installation remains effective indefinitely.

Project planning sequence

MAP → PRIORITISE → VERIFY → INTEGRATE → MAINTAIN

Map the hazard and building interfaces. Prioritise the interfaces with the greatest consequence. Verify the exact product information and local design requirements. Integrate structure, drainage, power, access and recovery. Maintain the system so the protection remains effective over time.

Project-specific technical review

Planning guidance first. Exact requirements confirmed for the project.

The planning guide helps identify what to protect and which questions to ask. Structural, flood, electrical, wildfire, drainage and product-performance decisions are then confirmed against the selected system, current project documentation, local requirements and qualified professional input where required.

Connected project pathway

Everything you need to take the next project step.

Weather Protection
Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Apollo NZ Global · International project supply

Build the weather-protection package around the property.

Send the location, plans, photos, opening dimensions and the weather exposures you are planning for. If the exact product is not listed, Apollo can review suitable supply pathways against the project brief.

Request Project Review Upload Plans
Project