Standardise the opening types first.
Identify bedroom-window, living-window, balcony-slider, entrance, garage and ground-floor commercial types. Once a protection solution is approved for each, it can be repeated across the relevant units.
Request Project ReviewProtection at development scale
Apartment and multi-unit projects can repeat the same windows, balcony doors and unit layouts hundreds of times. Apollo turns those repetitions into a coordinated protection schedule rather than treating each opening as a separate quote.

Identify bedroom-window, living-window, balcony-slider, entrance, garage and ground-floor commercial types. Once a protection solution is approved for each, it can be repeated across the relevant units.
Accordion shutters, roll-down protection or suitable impact sliding doors can be selected around actual balcony geometry, opening width, available stacking space and pressure requirements.
Repeated shutters can dominate an apartment elevation if housings, side guides, colours and stacking positions are not coordinated early with balconies, cladding and balustrades.
Motor servicing, common-area systems, exterior access, replacement components and responsibility between owners and building management should be considered before handover.
Plan · compare · specify
Permanent protection across repeated apartment window types.
Open pathway Related pathwayWide balcony and sliding-door protection.
Open pathway Related pathwayCoordinate new-build windows, sliders and deployable protection early.
Open pathwayTechnical claim control
Opening size, positive and negative design pressures, impact requirements, tracks or frames, anchors and structural substrate all affect final performance. Apollo ties numerical wind, impact and certification claims to the applicable tested or engineered configuration rather than applying one blanket rating to an entire product family.
Testing, standards & specificationApollo NZ Global · International project supply
Send the project location, drawings or photos, opening dimensions and any known wind or impact requirements.
Supply-only project model. Final structural design, fixings, installation, local approvals and code compliance remain project-specific unless expressly included in the quoted supply scope.