What is Testing, Standards & Specification?
Terms such as hurricane rated, impact resistant and 180 mph only become useful when the exact tested product, size, pressure, impact category, fixings and installation configuration are understood.
Request Project ReviewKnowledge Centre · technical authority
Terms such as hurricane rated, impact resistant and 180 mph only become useful when the exact tested product, size, pressure, impact category, fixings and installation configuration are understood.

Protection system · direct answers
Terms such as hurricane rated, impact resistant and 180 mph only become useful when the exact tested product, size, pressure, impact category, fixings and installation configuration are understood.
Send the project location, building type, drawings or clear photographs, relevant dimensions and structural information, and any known wind, design-pressure, impact, flood, shelter, access or local-code requirements that apply to this system.
No. Site hazard, dimensions, loads, support and anchorage, exact product configuration, installation method, applicable technical evidence and local approvals can all change the final specification.
Apollo is supply-only. Final engineering, fixings, installation, approvals and local code compliance remain with the appropriate manufacturer, approved specialist or client-side project team unless expressly included in the written scope.
Yes, where the product and project can be supported. Destination hazard, climate, freight, documentation, local engineering, certification and installation responsibilities are reviewed before supply.
Regional wind speed describes hazard. Component selection usually needs the positive and negative pressures acting on the actual opening, which can vary with building height, terrain, geometry, façade zone and opening size.
Where these standards are relevant, review the exact system tested, dimensions, impact classification and subsequent cyclic-pressure requirements. A brochure mentioning a standard is not enough by itself.
The current ASTM E1996-26 scope excludes exterior garage and rolling doors, so Apollo keeps large-door evidence separate rather than automatically applying fenestration impact language to those products.
For U.S. projects, ICC 500 is the storm-shelter baseline and FEMA P-361 adds safe-room criteria. Hazard use, occupancy, doors and other protective openings, anchorage, site hazards and local approval need to match the exact project. FEMA references are not product certification.
Florida or Miami-Dade evidence does not establish Australian cyclone compliance; Australian wind-design documentation does not become a U.S. hurricane approval; and either may require further review in Caribbean, Pacific or typhoon jurisdictions. The destination code and authority pathway stays primary.
GREEN means evidence supports the intended public claim. HOLD means the product can remain in the range but a specific numerical or certification claim needs more evidence. REJECT means the available evidence does not support the intended severe-weather statement.
Plan · compare · specify
Return to the commercial category and product families.
Open pathway Related pathwaySee where complete assembly evidence matters in permanent protected glazing.
Open pathway Related pathwayReview a product category that follows distinct test and approval pathways.
Open pathwayProject-specific performance
Apollo's customer pages intentionally avoid blanket numerical hurricane claims. Final compliance remains project- and jurisdiction-specific, and overseas test evidence does not automatically replace local engineering or approval requirements.
Testing, standards & specificationApollo NZ Global · International project supply
Send the project location, drawings or photos, known wind/code requirements, flood or storm-surge information and any shelter or critical-equipment requirements.
Supply-only project model. Final structural design, shelter design, fixings, installation, local approvals and code compliance remain project-specific unless expressly included in the quoted supply scope.