One resort can contain hundreds of different openings.
Guest-room windows, balcony sliders, villa entrances, restaurants, bars, reception glazing, garages, workshops and plant buildings can all require different protection systems.
Request Project ReviewProperty-wide hospitality protection
Hotels and resorts combine repeated guest-room openings with balconies, villas, restaurants, reception spaces, commercial areas and operational buildings. Apollo coordinates these different opening types under one Complete-Building Protection schedule.

Guest-room windows, balcony sliders, villa entrances, restaurants, bars, reception glazing, garages, workshops and plant buildings can all require different protection systems.
Where room and villa layouts repeat, standard opening packages can simplify procurement, installation, operation, maintenance and spare-parts planning.
A system that is easy to close on one building can become difficult across hundreds of openings. Motorisation, staff access, manual overrides, backup power and closure sequence should be planned as part of property operations.
Maintenance workshops, storage, laundry, kitchens, plant rooms and vehicle areas may be critical to recovery after a storm and belong inside the property-wide schedule.
Plan · compare · specify
Strong wide-opening protection for villa sliders and balconies.
Open pathway Related pathwayReduce deployment requirements across repeated guest-room openings.
Open pathway ApplicationPlan salt, corrosion, freight and remote-service realities.
Open pathwayTechnical claim control
Opening size, positive and negative design pressures, impact requirements, tracks or frames, anchors and structural substrate all affect final performance. Apollo ties numerical wind, impact and certification claims to the applicable tested or engineered configuration rather than applying one blanket rating to an entire product family.
Testing, standards & specificationApollo NZ Global · International project supply
Send the project location, drawings or photos, opening dimensions and any known wind or impact requirements.
Supply-only project model. Final structural design, fixings, installation, local approvals and code compliance remain project-specific unless expressly included in the quoted supply scope.