Treat the campus as one project.
Classroom blocks, administration, libraries, halls, sports buildings, workshops, stores and plant rooms can each use different protection while still belonging to one coordinated opening schedule.
Request Project ReviewCommunity + institutional protection
Schools and public sites often contain multiple building types across one campus. Apollo can coordinate classroom windows, entrances, halls, workshops, garages, plant rooms and other openings under one project schedule.

Classroom blocks, administration, libraries, halls, sports buildings, workshops, stores and plant rooms can each use different protection while still belonging to one coordinated opening schedule.
One approved window or shutter type can often be repeated across multiple rooms and buildings, simplifying documentation, installation and future replacement.
Number of shutters, staff availability, access, manual vs motorised operation and backup power should be considered before a protection package is frozen.
Opening protection can improve resilience, but any formal emergency-shelter classification depends on wider structural, life-safety and jurisdictional requirements beyond the window or shutter package.
Plan · compare · specify
Permanent protection for repeated classroom and administration glazing.
Open pathway Related pathwayProtect halls, workshops and service entrances.
Open pathway Related pathwayInclude mechanical and utility ventilation openings.
Open pathwayTechnical claim control
Opening size, positive and negative design pressures, impact requirements, tracks or frames, anchors and structural substrate all affect final performance. Apollo ties numerical wind, impact and certification claims to the applicable tested or engineered configuration rather than applying one blanket rating to an entire product family.
Testing, standards & specificationApollo NZ Global · International project supply
Send the project location, drawings or photos, opening dimensions and any known wind or impact requirements.
Supply-only project model. Final structural design, fixings, installation, local approvals and code compliance remain project-specific unless expressly included in the quoted supply scope.