Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Middle East Sports Hub

APOLLO SPORTS · GCC / FACILITY PROGRAMME 06

Elite performance & athlete development

Specify training floors, strength stations, timing and recovery-adjacent infrastructure around the athlete programme. Equipment selection begins with training objectives and verified model specifications—not visual preference alone.

Elite performance & athlete development facility systems and zone planningArchitectural functional-zoning study
PROJECT APPLICATIONSElite sports institutes · professional clubs · universities · private performance operatorsINTERNATIONAL SUPPLY ONLY · LOCAL DESIGN AND INSTALLATION

01 / APPLICATIONS

Identify the facility programme before selecting equipment.

01

Strength and conditioning centres

02

Sports science and athlete monitoring spaces

03

Team training facilities and testing zones

04

Multi-sport university performance labs

02 / COORDINATED SUPPLY

Systems that should be specified together.

01

Strength and training

TORVYR strength equipment, racks, benches, weightlifting stations and appropriate support flooring.

02

Measurement and performance

Model-confirmed VBT, timing, force testing and sprint technology with network/power and calibration interfaces.

03

Facility zoning

Straight sprint lanes, free-weight safety zones, training platforms, recovery and coaching circulation.

04

Supporting venue systems

FÍSVOR displays and controlled training feedback where required; supplier documentation and data policies must be confirmed.

03 / TECHNICAL PROCUREMENT

Confirm the interfaces before requesting prices.

Planning priorities

  • Agree athlete cohort, training programme and supervision/operations model.
  • Define loadings, equipment anchorage, rack spacing and platform clearances through facility designers.
  • Specify any performance tech only where an actual tested product and integration workflow exist.
  • Separate movement, lifting, high-speed running and spectator/visitor areas.

Supplier evidence and submittals

  • Itemised exact-model equipment and safety drawings
  • Testing device technical interfaces and software/data notes
  • Floor protection, maintenance and installation requirements
  • Spare parts, support, warranty and commissioning information

04 / DELIVERY RESPONSIBILITIES

Clear division between international supply and local works.

Apollo product-supply package

Coordinated equipment schedules, project quotations, manufacturer submittals, packaging and logistics arrangements for the agreed scope.

Open existing procurement toolkit

Appointed local team

  • Structural loading and electrical/data engineering
  • Equipment installation, safe use training and commissioning
  • Athlete safety and facility operator policies

05 / PROCUREMENT APPLICATION

How these systems can work together.

A university performance centre can separate strength and sprint equipment procurement from its local building design, with the final layout approved by the sports science team and appointed safety professionals.

Equipment selection, dimensions and delivery scope are confirmed against the actual project requirements and the appointed local team’s approved documentation.

Elite performance & athlete development related facility planning study

FROM BRIEF TO QUOTATION

One technical scope. Clear supply responsibilities.

Apollo provides international wholesale and coordinated project product supply only. Local project professionals and contractors undertake surveys, design, code compliance, engineering, foundations, civil and electrical works, installation, commissioning and approvals. Exact-model evidence, local eligibility and freight arrangements are confirmed for each project.

Project