Middle East Sports Hub APOLLO SPORTS · GCC / FACILITY PROGRAMME 06
Specify training floors, strength stations, timing and recovery-adjacent infrastructure around the athlete programme. Equipment selection begins with training objectives and verified model specifications—not visual preference alone.
Architectural functional-zoning study01 / APPLICATIONS
02 / COORDINATED SUPPLY
TORVYR strength equipment, racks, benches, weightlifting stations and appropriate support flooring.
Model-confirmed VBT, timing, force testing and sprint technology with network/power and calibration interfaces.
Straight sprint lanes, free-weight safety zones, training platforms, recovery and coaching circulation.
FÍSVOR displays and controlled training feedback where required; supplier documentation and data policies must be confirmed.
03 / TECHNICAL PROCUREMENT
04 / DELIVERY RESPONSIBILITIES
Coordinated equipment schedules, project quotations, manufacturer submittals, packaging and logistics arrangements for the agreed scope.
Open existing procurement toolkit05 / PROCUREMENT APPLICATION
A university performance centre can separate strength and sprint equipment procurement from its local building design, with the final layout approved by the sports science team and appointed safety professionals.
Equipment selection, dimensions and delivery scope are confirmed against the actual project requirements and the appointed local team’s approved documentation.

FROM BRIEF TO QUOTATION
Apollo provides international wholesale and coordinated project product supply only. Local project professionals and contractors undertake surveys, design, code compliance, engineering, foundations, civil and electrical works, installation, commissioning and approvals. Exact-model evidence, local eligibility and freight arrangements are confirmed for each project.