University performance centre.

Integrated strength, conditioning and athlete testing areas, with equipment, surface and data coordination.

University performance centre facility overview

FACILITY RELATIONSHIPS

See how the systems connect.

Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.

Original editable technical SVG
Six premium training areas: lift, move, sprint, test, coach and serviceView full-size facility drawing

PACKAGE SCOPE

From essential systems to coordinated facility supply.

Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.

COREParticipation essentials
  • TORVYR strength and conditioning equipment
  • Training flooring, impact zones and lanes
  • Safe equipment access, circulation and storage
PLUSDeveloped facility
  • Force plate, timing and performance systems where verified
  • Training displays and coaching interfaces
  • Multi-zone functional training
COMPLETECoordinated venue supply
  • Additional performance science and testing zones
  • Supporting venue display and space systems
  • Equipment replacement and servicing programme

PROJECT-SPECIFIC TECHNICAL CHECKS

Resolve the interfaces before procurement.

These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.

01Structural floor loading, fixing and vibration
02Electrical, data and software interoperability
03Supervision, safeguarding and user throughput
04Supplier-specific equipment verification and serviceability

PROCUREMENT CHECKLIST

Documents your project team should prepare.

01Facility and user programme
02Existing-site drawings and photographs
03Applicable sport and local compliance criteria
04Equipment and interface schedule
05Technical submittal and evidence requirements
06Supply, exclusions and local responsibilities
07Freight, receiving and delivery requirements
08Maintenance, spares and staged expansion

Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.

LUTHVAR / FACILITY PLANNING LIBRARY

Download the facility planning pack.

Use the guide alongside its matching editable procurement schedule. Each serves a different purpose, and both follow the same facility scope.

These resources support early planning and product procurement. Facility diagrams are not scaled construction drawings. Technical criteria, supplier documents and local statutory requirements must be checked for the exact project. Apollo supplies products only; local specialists undertake engineering, approvals, civil work and installation.

TENDER & PROCUREMENT

Request evidence and coordinate supply.

Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.

FACILITY PLANNING EXAMPLES

See a potential procurement situation.

Working examples, not real Apollo case studies. Each identifies the product scope and responsibilities relevant to this type of facility.

CONNECTED APOLLO SYSTEMS

Go deeper into the specific products.

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project