- TORVYR strength and conditioning equipment
- Training flooring, impact zones and lanes
- Safe equipment access, circulation and storage
CAMPUS / HIGH PERFORMANCE · TRAINING / SPORT SCIENCE
University performance centre.
Integrated strength, conditioning and athlete testing areas, with equipment, surface and data coordination.

FACILITY RELATIONSHIPS
See how the systems connect.
Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.
Original editable technical SVG
View full-size facility drawing PACKAGE SCOPE
From essential systems to coordinated facility supply.
Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.
- Force plate, timing and performance systems where verified
- Training displays and coaching interfaces
- Multi-zone functional training
- Additional performance science and testing zones
- Supporting venue display and space systems
- Equipment replacement and servicing programme
PROJECT-SPECIFIC TECHNICAL CHECKS
Resolve the interfaces before procurement.
These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.
PROCUREMENT CHECKLIST
Documents your project team should prepare.
Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.
Download the facility planning pack.
Use the guide alongside its matching editable procurement schedule. Each serves a different purpose, and both follow the same facility scope.

University performance centre
Strength, movement, testing, TORVYR equipment and data coordination.
These resources support early planning and product procurement. Facility diagrams are not scaled construction drawings. Technical criteria, supplier documents and local statutory requirements must be checked for the exact project. Apollo supplies products only; local specialists undertake engineering, approvals, civil work and installation.
TENDER & PROCUREMENT
Request evidence and coordinate supply.
Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.
FACILITY PLANNING EXAMPLES
See a potential procurement situation.
Working examples, not real Apollo case studies. Each identifies the product scope and responsibilities relevant to this type of facility.
CONNECTED APOLLO SYSTEMS
Go deeper into the specific products.
FROM FACILITY PLAN TO SUPPLY SCOPE
Build one clear brief for every product decision.
Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.
