Skip to main content
Apollo NZ GlobalSports Project Brief
SARENTAARCHITECTURAL STRUCTURE SYSTEMS

Covered tennis

Create a wide-span tennis hall with the vertical clearance the game requires.

The supplier's tennis-hall system is designed around wide spans, clear hitting volume and rapid prefabricated construction. Apollo can coordinate the structure with professional sports flooring and lighting as part of the wider tennis facility brief.

Clear-span platform Project engineering Complete sports-package pathway
Product-faithful clear-span aluminium tennis hall with professional courts

Supplier-supported capability

What the current material actually supports.

Supplier sports catalogue pages 5–7 support the tennis-specific wide-span, vertical-clearance, flooring and lighting statements.

Wide-span tennis-hall pathway with generous vertical playing clearance

High-strength aluminium structural frame

PVC-coated polyester cover

Professional sports flooring available

Professional court lighting available

Modular prefabricated delivery pathway

Facility planning

Freeze the hall only after the sport brief is clear.

01Court count
02Baseline + side run-off
03Ball-flight clearance
04Lighting + visual background
05Surface + base
06Ventilation / thermal comfort
07Spectator + coaching zones
08Local engineering + approvals

Complete Apollo facility stack

The structure is only one layer of the sports venue.

Connect SARENTA SPORT to Apollo's existing court, lighting, seating, acoustic, containment and equipment pathways instead of sourcing each layer independently.

Shared SARENTA technical foundation

Known platform data. Final design remains project-specific.

These are supplier-confirmed planning references, not universal design ratings. Wind, snow, fire, profile sizing, foundations and statutory compliance are resolved against the destination project.

01 · Main-series span5–60 m

Overall SARENTA supplier-confirmed clear-span reference range; sport-specific geometry remains project-led.

02 · Frame6061-T6 aluminium

Supplier-confirmed standard high-strength extruded aluminium structural frame.

03 · Membrane650–1250 gsm PVC

Multiple PVC membrane weights are available, with optional PVDF top coat.

04 · EngineeringProject-specific

Structural calculations, structural drawings, base-positioning and embedment drawings can be supplied.

05 · WallsFabric · panel · glass · ABS

Envelope pathway is selected around sport, climate, security and thermal requirements.

06 · AnchoringConcrete · screw · ballast · temporary

Final foundation / anchoring method is selected against site, loads and intended duration.

SARENTA

Start SARENTA SPORT

Send the destination, sport mix, court count and approximate hall dimensions.

Apollo NZ Global is supply-only. Final structural design, foundations, anchoring, erection, electrical / mechanical services, local engineering, fire strategy, accessibility and statutory approvals remain project-specific.

Start sports brief
Project