Skip to main content
Apollo NZ GlobalStart Project Brief
ATHREN — Sports & Flooring Systems

ATHREN FIELD · Football Facility Systems

Build the football field as a complete performance and operating system.

ATHREN FIELD football projects connect the selected playing surface to the complete facility: infill or non-infill construction, shockpad where required, base and drainage interfaces, goals, perimeter, lighting, player and spectator infrastructure, technology and maintenance. Any FIFA Quality or FIFA Quality Pro requirement remains tied to the exact source system and completed-field certification pathway.

Performance · Club · Community · Non-InfillSurface + complete field infrastructureProject-specific FIFA pathwayGlobal supply-only coordination
Modern synthetic football field with clubhouse, benches, fencing and sports lightingIllustrative ATHREN FIELD football facility concept. Final turf system, infrastructure and certification pathway are project-specific.

Field to facility

Define the football programme before choosing the field system.

Training volume, competition level, maintenance capability, climate and field sharing all affect the right football construction and the infrastructure around it.

01 · 01

Define use and performance level

Record competition, training, school or community use, weekly loading, age groups and any FIFA or tender requirement.

02 · 02

Choose the complete surface system

Confirm turf construction, infill or non-infill pathway, shockpad where required, seams, line marking and current test documentation.

03 · 03

Coordinate the field infrastructure

Resolve base, drainage, goals, perimeter, lighting, benches, spectators, technology, access and maintenance equipment around the layout.

04 · 04

Freeze supply, testing and responsibilities

Confirm product scope, freight, local installer role, finished-field testing where required and destination approvals before order.

Apollo coordinates the agreed product package. Local civil works, foundations, electrical work, installation, field testing and statutory approvals remain separate project responsibilities unless expressly included.

Product details

Complete football facility building blocks

The exact package changes with playing level, usage, climate, maintenance model and any federation or procurement requirement.

01Playing surface
Performance · Club · Community · Training · Non-InfillThe exact turf system is selected against use intensity, maintenance, climate and current product documentation.
02Infill strategy
Filled · reduced-infill · selected non-infillThe construction is selected as a complete system; infill type and quantity are not treated as interchangeable.
03Shockpad
System-specific where requiredMaterial, thickness and role depend on the exact tested system and project performance requirement.
04Base interface
Project-specific civil designLevels, tolerances, falls and structural stability must be resolved before the sports surface is installed.
05Drainage
Surface + sub-surface strategyLocal rainfall, base design, outlets and perimeter water management are coordinated before final system selection.
06Goals & equipment
Training · club · competitionGoal type, anchoring, storage and supporting field equipment are selected around the operating programme.
07Perimeter & ball-stop
Fencing · gates · high containmentField geometry, neighbouring uses, spectator separation and maintenance access control the perimeter strategy.
08Sports lighting
Project photometric designMounting, optics, glare, uniformity and operating levels are developed around the actual field.
09Players & officials
Benches · shelters · technical areasTeam, officials, medical and coaching areas are coordinated with sidelines and field access.
10Spectators
Bleachers · grandstands · accessible viewingSpectator infrastructure scales with venue type and expected attendance.
11Technology
Scoreboards · cameras · connectivityCoaching, analysis, streaming and venue-operation requirements are scoped separately.
12Maintenance
System-specificBrushing, decompaction, infill control where applicable, cleaning and inspection must match the selected turf construction.
13Supply model
Supply onlyApollo supplies the agreed products and documents; local civil, electrical, installation, testing and compliance remain separate scopes.

Exact turf, infill, shockpad, base, drainage, FIFA-related documentation, warranty, maintenance and finished-field testing are confirmed against the selected system before quotation. Apollo NZ Global is supply-only.

Complete football facility

Connect the field surface to the infrastructure that makes the venue work.

Use ATHREN FIELD for the playing system, then coordinate the wider Apollo sports platform around the complete football brief.

Applications + project fit

Football fields perform as systems, not as turf rolls.

Non-infill is a separate pathway

Where a non-infill construction is suitable, it is selected as a complete engineered field system rather than as a direct substitute for every filled football turf.

Certification remains exact-system specific

Any FIFA Quality or FIFA Quality Pro requirement is matched to the exact underlying product/system and finished-field certification process.

Maintenance changes the selection

Available equipment, staff, usage and replacement strategy influence whether filled, reduced-infill or non-infill pathways are practical.

Climate matters

Heat, UV, rainfall and drainage influence yarn, infill, field temperature, maintenance and the broader operating plan.

Shared facilities need a hierarchy

Where football shares a site or field with other sports, the primary sport and performance requirement must be established before system selection.

The venue can be staged

Schools, clubs and councils can prioritise the core field and add larger spectator, technology or amenity systems in later phases.

Applications
Football clubsSchools and academiesCommunity sports facilitiesTraining centresShared football fieldsMulti-field precinctsInternational sports projects
Product snapshot

ATHREN FIELD Football Facility Systems

Complete football facility pathway connecting performance, club, community, training and selected non-infill systems with shockpad where required, base and drainage interfaces, goals, perimeter, sports lighting, player and spectator infrastructure, technology and maintenance planning. FIFA-related documentation remains tied to the exact system and finished field. Apollo NZ Global is supply-only.

ATHRENSports Surfaces & FlooringLive product pathway
Applications

Clubs Sports Venues

Configuration

Project Reviewed

TechnicalTechnical documents not yet centralisedDrawingsDrawing review by projectRegionalGlobal project reviewRelated0 controlled pathwaysSupply modelSupply-only · manual project quotation

This snapshot summarises the current Apollo product record. Final configuration, interfaces, engineering, certification and destination requirements are confirmed against the project.

Project planning

Useful product details at a glance.

Product information
Project checkTechnical Review Required

Configuration, technical evidence, interfaces, exposure or destination requirements need product-specific review before the final supply package is confirmed.

Build project brief

Final engineering, testing, approvals and destination requirements are confirmed for the actual project where applicable.

Connected project pathway

Everything you need to take the next project step.

ATHREN · Sports & Flooring Systems
Related pathwayProject Upload Tool
Regional project pathwayATHREN FIELD Sports Turf Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Ready to review the project?

Send the dimensions, quantity, destination and the information you already have.

Apollo NZ Global

Global products. Global projects. Practical supply solutions.
Apollo NZ Global is supply-only unless a written project scope states otherwise.

sales@apollonzglobal.com
Project