Structure the sports-field tender before exact product values are inserted.

Use these templates to keep the complete field system, evidence, civil interfaces, installation, maintenance and finished-field responsibilities visible. The schedules deliberately leave product-specific values open until current technical documents for the exact offered system are verified.

Controlled tender wording

ATHREN FIELD specification clauses.

These clauses can be copied into an early tender or consultant schedule, then completed against the exact sport, destination and selected field system.

01SPORTS FIELD CLAUSE

Exact system identity

The tender return shall identify the exact sports-turf product and complete system build-up offered, including turf, infill where applicable, shockpad or elastic layer where applicable, joining materials, line-marking method and any other component required for the stated performance pathway.

02SPORTS FIELD CLAUSE

Federation / performance evidence

Where FIH, FIFA, World Rugby, ITF or other stated performance evidence is required, the tenderer shall provide current documentation applicable to the exact product/system offered and shall identify any finished-field testing, certification or validation required after installation. Brand-level claims or evidence for a different construction shall not be treated as equivalent.

03SPORTS FIELD CLAUSE

Base and drainage interface

The sports-surface supplier shall state the required base tolerances, falls, drainage interfaces and substrate conditions for the offered system. Local civil design, earthworks, base construction and drainage engineering remain with the appointed project team unless expressly included in the supply scope.

04SPORTS FIELD CLAUSE

Installation and finished-field testing

The tender return shall identify installation requirements, approved or recommended installer expectations, commissioning requirements and any finished-field testing applicable to the project. Installation and testing responsibilities shall be stated clearly before order.

05SPORTS FIELD CLAUSE

Warranty and maintenance

The tender return shall include the current warranty applicable to the exact supplied system together with the maintenance requirements, exclusions, inspection expectations and any specialist equipment or consumables needed to maintain the stated performance.

06SPORTS FIELD CLAUSE

Sports-field substitution

A proposed substitute shall be compared as a complete field system. Similar pile height, colour, yarn appearance or price does not establish equivalence. The substitution review shall include exact system build-up, current test evidence, maintenance, warranty, installation, destination conditions and any certification pathway required by the project.

These are coordination templates, not final engineered specifications or legal advice. Project-specific technical, contractual and local-code requirements still require review by the appointed project professionals.

ATHREN FIELD · Hockey

Hockey Field Tender / Specification Schedule

Use this to structure a dry, elite, club, community or Hockey5s field tender before exact product values are inserted.

RequirementTender / specification requirementRequired supplier evidenceProject-team inputStatus / tender note
Intended hockey levelProject/system statementClient / consultant briefOpen
Surface pathwayDry / non-irrigated, high-performance non-filled, dressed or community/shared-useCurrent TDS + exact system identityPlaying-level requirementOpen
FIH requirementCurrent exact product/system evidence + finished-field pathwayTender / federation requirementOpen
Shockpad / elastic layerExact system build-up + TDSCivil / performance briefOpen
Water / irrigation strategySystem requirement + operating guidanceWater supply / irrigation designOpen
Base tolerances and fallsInstallation / base requirementsCivil design and surveyOpen
Drainage interfaceSurface / base drainage requirementsCivil drainage designOpen
Seams and line markingInstallation specificationFinal field layoutOpen
Goals / field equipmentEquipment dataSport / venue requirementOpen
Perimeter / ball-stopProduct data where includedSite layout / safety briefOpen
Lighting interfaceLighting brief where includedPhotometric / electrical designOpen
InstallationCurrent installation manualAppointed installer / programmeOpen
MaintenanceCurrent maintenance guideOperator capabilityOpen
WarrantyCurrent warrantyProcurement requirementOpen
Finished-field testingTesting / certification pathwayAppointed test body / project teamOpen

Do not describe ATHREN itself as FIH certified. Any FIH requirement must remain attached to the exact underlying product/system and finished-field process.

ATHREN FIELD · Football

Football Field Tender / Specification Schedule

Use this for performance, club, community, training and selected non-infill football field procurement.

RequirementTender / specification requirementRequired supplier evidenceProject-team inputStatus / tender note
Intended football levelProject/system statementClient / consultant briefOpen
Surface pathwayFilled, reduced-infill or selected non-infillCurrent TDS + exact system identityUse / maintenance briefOpen
FIFA requirementCurrent exact system evidence + completed-field pathwayTender / federation requirementOpen
Turf constructionCurrent product TDSPerformance briefOpen
Infill systemMaterial / quantity / system dataEnvironmental / maintenance criteriaOpen
ShockpadExact system build-up + TDSPerformance / civil briefOpen
Base tolerances and fallsInstallation / base requirementsCivil design and surveyOpen
Drainage interfaceSurface / base drainage requirementsCivil drainage designOpen
Goals / equipmentEquipment dataSport / venue requirementOpen
Perimeter / ball-stopProduct data where includedSite layout / neighbour briefOpen
Lighting interfaceLighting brief where includedPhotometric / electrical designOpen
InstallationCurrent installation manualInstaller / programmeOpen
MaintenanceCurrent maintenance guideOperator capabilityOpen
WarrantyCurrent warrantyProcurement requirementOpen
Finished-field testingTesting / certification pathwayProject team / test bodyOpen

FIFA Quality or FIFA Quality Pro language must be matched to the exact offered system and completed-field process where required.

ATHREN FIELD · Rugby

Rugby Field Tender / Specification Schedule

Use this for performance, club, community and shared rugby/football fields where player-impact requirements drive the complete system.

RequirementTender / specification requirementRequired supplier evidenceProject-team inputStatus / tender note
Intended rugby levelProject/system statementClient / consultant briefOpen
Field sharingRugby only or rugby + footballSystem suitability statementOperating briefOpen
World Rugby requirementCurrent exact system / Regulation 22 evidence + finished-field pathwayTender / federation requirementOpen
Turf constructionCurrent product TDSPerformance briefOpen
Infill systemMaterial / quantity / system dataEnvironmental / maintenance criteriaOpen
Shockpad / impact layerExact tested build-up + TDSImpact / civil briefOpen
Impact performanceCurrent exact system test reportTender performance criteriaOpen
Base tolerances and fallsInstallation / base requirementsCivil design and surveyOpen
Drainage interfaceSurface / base drainage requirementsCivil drainage designOpen
Rugby posts / paddingEquipment dataSport / venue requirementOpen
Perimeter and accessProduct data where includedSafety / access briefOpen
Lighting interfaceLighting brief where includedPhotometric / electrical designOpen
InstallationCurrent installation manualInstaller / programmeOpen
MaintenanceCurrent maintenance guideOperator capabilityOpen
Warranty + testingCurrent warranty + testing pathwayProcurement / testing teamOpen

Do not publish or tender generic shock-absorption, HIC or deformation values unless they are tied to the exact offered tested system.

ATHREN FIELD · School / Community Multisport

School & Community Multisport Field Tender / Specification Schedule

Use this for shared-use school, council, club and community fields where the sport hierarchy controls the surface and equipment strategy.

RequirementTender / specification requirementRequired supplier evidenceProject-team inputStatus / tender note
Primary sportProgramme statementSchool / club / council briefOpen
Secondary / occasional sportsProgramme statementTimetable / community-use briefOpen
Surface pathwayCurrent TDS + suitability statementSport hierarchyOpen
Shockpad / impact layerExact build-up where requiredSafety / performance briefOpen
Line-marking hierarchyLine system / installation dataFinal sports scheduleOpen
Base tolerances and fallsInstallation / base requirementsCivil design and surveyOpen
Drainage interfaceSurface / base drainage requirementsCivil drainage designOpen
Fixed / removable equipmentEquipment dataStorage / changeover briefOpen
Perimeter / gatesProduct data where includedSupervision / access briefOpen
Lighting interfaceLighting brief where includedOperating-hours briefOpen
Storage / maintenance accessOperating requirementsSite / building planOpen
InstallationCurrent installation manualInstaller / programmeOpen
MaintenanceCurrent maintenance guideOperator capabilityOpen
WarrantyCurrent warrantyProcurement requirementOpen
Sport-specific evidenceExact relevant test evidenceAny stated tender requirementOpen

The primary sport should control the most demanding surface requirement. A generic multisport label does not establish suitability for every activity.