Structure the sports-field tender before exact product values are inserted.
Use these templates to keep the complete field system, evidence, civil interfaces, installation, maintenance and finished-field responsibilities visible. The schedules deliberately leave product-specific values open until current technical documents for the exact offered system are verified.
These clauses can be copied into an early tender or consultant schedule, then completed against the exact sport, destination and selected field system.
01SPORTS FIELD CLAUSE
Exact system identity
The tender return shall identify the exact sports-turf product and complete system build-up offered, including turf, infill where applicable, shockpad or elastic layer where applicable, joining materials, line-marking method and any other component required for the stated performance pathway.
02SPORTS FIELD CLAUSE
Federation / performance evidence
Where FIH, FIFA, World Rugby, ITF or other stated performance evidence is required, the tenderer shall provide current documentation applicable to the exact product/system offered and shall identify any finished-field testing, certification or validation required after installation. Brand-level claims or evidence for a different construction shall not be treated as equivalent.
03SPORTS FIELD CLAUSE
Base and drainage interface
The sports-surface supplier shall state the required base tolerances, falls, drainage interfaces and substrate conditions for the offered system. Local civil design, earthworks, base construction and drainage engineering remain with the appointed project team unless expressly included in the supply scope.
04SPORTS FIELD CLAUSE
Installation and finished-field testing
The tender return shall identify installation requirements, approved or recommended installer expectations, commissioning requirements and any finished-field testing applicable to the project. Installation and testing responsibilities shall be stated clearly before order.
05SPORTS FIELD CLAUSE
Warranty and maintenance
The tender return shall include the current warranty applicable to the exact supplied system together with the maintenance requirements, exclusions, inspection expectations and any specialist equipment or consumables needed to maintain the stated performance.
06SPORTS FIELD CLAUSE
Sports-field substitution
A proposed substitute shall be compared as a complete field system. Similar pile height, colour, yarn appearance or price does not establish equivalence. The substitution review shall include exact system build-up, current test evidence, maintenance, warranty, installation, destination conditions and any certification pathway required by the project.
These are coordination templates, not final engineered specifications or legal advice. Project-specific technical, contractual and local-code requirements still require review by the appointed project professionals.
ATHREN FIELD · Hockey
Hockey Field Tender / Specification Schedule
Use this to structure a dry, elite, club, community or Hockey5s field tender before exact product values are inserted.
Requirement
Tender / specification requirement
Required supplier evidence
Project-team input
Status / tender note
Intended hockey level
Project/system statement
Client / consultant brief
Open
Surface pathway
Dry / non-irrigated, high-performance non-filled, dressed or community/shared-use
Current TDS + exact system identity
Playing-level requirement
Open
FIH requirement
Current exact product/system evidence + finished-field pathway
Tender / federation requirement
Open
Shockpad / elastic layer
Exact system build-up + TDS
Civil / performance brief
Open
Water / irrigation strategy
System requirement + operating guidance
Water supply / irrigation design
Open
Base tolerances and falls
Installation / base requirements
Civil design and survey
Open
Drainage interface
Surface / base drainage requirements
Civil drainage design
Open
Seams and line marking
Installation specification
Final field layout
Open
Goals / field equipment
Equipment data
Sport / venue requirement
Open
Perimeter / ball-stop
Product data where included
Site layout / safety brief
Open
Lighting interface
Lighting brief where included
Photometric / electrical design
Open
Installation
Current installation manual
Appointed installer / programme
Open
Maintenance
Current maintenance guide
Operator capability
Open
Warranty
Current warranty
Procurement requirement
Open
Finished-field testing
Testing / certification pathway
Appointed test body / project team
Open
Do not describe ATHREN itself as FIH certified. Any FIH requirement must remain attached to the exact underlying product/system and finished-field process.
ATHREN FIELD · Football
Football Field Tender / Specification Schedule
Use this for performance, club, community, training and selected non-infill football field procurement.
Requirement
Tender / specification requirement
Required supplier evidence
Project-team input
Status / tender note
Intended football level
Project/system statement
Client / consultant brief
Open
Surface pathway
Filled, reduced-infill or selected non-infill
Current TDS + exact system identity
Use / maintenance brief
Open
FIFA requirement
Current exact system evidence + completed-field pathway
Tender / federation requirement
Open
Turf construction
Current product TDS
Performance brief
Open
Infill system
Material / quantity / system data
Environmental / maintenance criteria
Open
Shockpad
Exact system build-up + TDS
Performance / civil brief
Open
Base tolerances and falls
Installation / base requirements
Civil design and survey
Open
Drainage interface
Surface / base drainage requirements
Civil drainage design
Open
Goals / equipment
Equipment data
Sport / venue requirement
Open
Perimeter / ball-stop
Product data where included
Site layout / neighbour brief
Open
Lighting interface
Lighting brief where included
Photometric / electrical design
Open
Installation
Current installation manual
Installer / programme
Open
Maintenance
Current maintenance guide
Operator capability
Open
Warranty
Current warranty
Procurement requirement
Open
Finished-field testing
Testing / certification pathway
Project team / test body
Open
FIFA Quality or FIFA Quality Pro language must be matched to the exact offered system and completed-field process where required.
ATHREN FIELD · Rugby
Rugby Field Tender / Specification Schedule
Use this for performance, club, community and shared rugby/football fields where player-impact requirements drive the complete system.
Requirement
Tender / specification requirement
Required supplier evidence
Project-team input
Status / tender note
Intended rugby level
Project/system statement
Client / consultant brief
Open
Field sharing
Rugby only or rugby + football
System suitability statement
Operating brief
Open
World Rugby requirement
Current exact system / Regulation 22 evidence + finished-field pathway
Tender / federation requirement
Open
Turf construction
Current product TDS
Performance brief
Open
Infill system
Material / quantity / system data
Environmental / maintenance criteria
Open
Shockpad / impact layer
Exact tested build-up + TDS
Impact / civil brief
Open
Impact performance
Current exact system test report
Tender performance criteria
Open
Base tolerances and falls
Installation / base requirements
Civil design and survey
Open
Drainage interface
Surface / base drainage requirements
Civil drainage design
Open
Rugby posts / padding
Equipment data
Sport / venue requirement
Open
Perimeter and access
Product data where included
Safety / access brief
Open
Lighting interface
Lighting brief where included
Photometric / electrical design
Open
Installation
Current installation manual
Installer / programme
Open
Maintenance
Current maintenance guide
Operator capability
Open
Warranty + testing
Current warranty + testing pathway
Procurement / testing team
Open
Do not publish or tender generic shock-absorption, HIC or deformation values unless they are tied to the exact offered tested system.
ATHREN FIELD · School / Community Multisport
School & Community Multisport Field Tender / Specification Schedule
Use this for shared-use school, council, club and community fields where the sport hierarchy controls the surface and equipment strategy.
Requirement
Tender / specification requirement
Required supplier evidence
Project-team input
Status / tender note
Primary sport
Programme statement
School / club / council brief
Open
Secondary / occasional sports
Programme statement
Timetable / community-use brief
Open
Surface pathway
Current TDS + suitability statement
Sport hierarchy
Open
Shockpad / impact layer
Exact build-up where required
Safety / performance brief
Open
Line-marking hierarchy
Line system / installation data
Final sports schedule
Open
Base tolerances and falls
Installation / base requirements
Civil design and survey
Open
Drainage interface
Surface / base drainage requirements
Civil drainage design
Open
Fixed / removable equipment
Equipment data
Storage / changeover brief
Open
Perimeter / gates
Product data where included
Supervision / access brief
Open
Lighting interface
Lighting brief where included
Operating-hours brief
Open
Storage / maintenance access
Operating requirements
Site / building plan
Open
Installation
Current installation manual
Installer / programme
Open
Maintenance
Current maintenance guide
Operator capability
Open
Warranty
Current warranty
Procurement requirement
Open
Sport-specific evidence
Exact relevant test evidence
Any stated tender requirement
Open
The primary sport should control the most demanding surface requirement. A generic multisport label does not establish suitability for every activity.