Skip to main content
Apollo NZ GlobalUpload Project Documents

ATHREN FIELD · Technical Document Centre

One controlled place for the documents behind each field system.

Planning resources are available now. Product data sheets, federation evidence, test reports, exact system build-ups, installation manuals, maintenance guidance and warranties move into the public technical library only after they are matched to the exact ATHREN FIELD pathway and verified as current.

01
ATHREN FIELDHockey

7 controlled resource / evidence slots.

02
ATHREN FIELDFootball

7 controlled resource / evidence slots.

03
ATHREN FIELDRugby

7 controlled resource / evidence slots.

04
ATHREN FIELDSchool / Community Multisport

7 controlled resource / evidence slots.

05
ATHREN FIELDTennis Turf

6 controlled resource / evidence slots.

ATHREN FIELD · Hockey

Hockey document register

Use the available planning resources now. Pending product evidence will be released only after current document matching and review.

Open surface pathway
Document / resourceStatusControl noteOpen
ATHREN FIELD Hockey Surface Systems AvailablePublic pathway and controlled specification framework.Open
Hockey Facility 101 AvailableFacility-planning guide.Open
Exact product technical data sheets Pending verified evidencePopulate by Dry / Elite / Club / Community source system.Not public yet
Current FIH evidence Pending verified evidenceMatch to exact product/system and validity/current status.Not public yet
Complete system build-up + shockpad data Pending verified evidenceInclude all required layers and installation materials.Not public yet
Installation + maintenance manuals Pending verified evidenceCurrent issue matched to quoted system.Not public yet
Warranty Pending verified evidenceExact legal entity, term, exclusions and maintenance conditions.Not public yet

ATHREN FIELD · Football

Football document register

Use the available planning resources now. Pending product evidence will be released only after current document matching and review.

Open surface pathway
Document / resourceStatusControl noteOpen
ATHREN FIELD Football Surface Systems AvailablePublic pathway and controlled specification framework.Open
Synthetic Football Field 101 AvailableFacility-planning guide.Open
Exact product technical data sheets Pending verified evidencePopulate by Performance / Club / Community / Non-Infill source system.Not public yet
Current FIFA-related system evidence Pending verified evidenceMatch exact source system and completed-field pathway where applicable.Not public yet
Infill / non-infill + shockpad build-up Pending verified evidenceFull construction and component data.Not public yet
Installation + maintenance manuals Pending verified evidenceCurrent issue matched to quoted system.Not public yet
Warranty Pending verified evidenceExact product/system warranty and exclusions.Not public yet

ATHREN FIELD · Rugby

Rugby document register

Use the available planning resources now. Pending product evidence will be released only after current document matching and review.

Open surface pathway
Document / resourceStatusControl noteOpen
ATHREN FIELD Rugby Surface Systems AvailablePublic pathway and controlled specification framework.Open
Rugby Turf 101 AvailableImpact-system planning guide.Open
Exact product technical data sheets Pending verified evidencePopulate by Performance / Club / Community / Shared Code source system.Not public yet
Current World Rugby / Regulation 22 evidence Pending verified evidenceExact tested system and finished-field obligations.Not public yet
Shockpad + impact-system build-up Pending verified evidenceInclude current impact test reports for the exact construction.Not public yet
Installation + maintenance manuals Pending verified evidenceCurrent issue matched to quoted system.Not public yet
Warranty Pending verified evidenceExact system warranty and maintenance conditions.Not public yet

ATHREN FIELD · School / Community Multisport

School / Community Multisport document register

Use the available planning resources now. Pending product evidence will be released only after current document matching and review.

Open surface pathway
Document / resourceStatusControl noteOpen
ATHREN FIELD Multisport Field Systems AvailablePublic shared-use pathway.Open
School & Community Multisport Field Planning AvailableSport-hierarchy planning guide.Open
Exact product technical data sheets Pending verified evidenceMap to the agreed primary and secondary sports.Not public yet
Sport-specific test evidence Pending verified evidenceOnly where required by the actual shared-use brief.Not public yet
Line-marking / equipment compatibility Pending verified evidenceConfirm permanent and secondary line approach.Not public yet
Installation + maintenance manuals Pending verified evidenceCurrent issue matched to selected construction.Not public yet
Warranty Pending verified evidenceExact product/system warranty.Not public yet

ATHREN FIELD · Tennis Turf

Tennis Turf document register

Use the available planning resources now. Pending product evidence will be released only after current document matching and review.

Open surface pathway
Document / resourceStatusControl noteOpen
ATHREN FIELD Tennis Turf Systems AvailablePublic tennis-turf pathway.Open
Exact product technical data sheets Pending verified evidencePopulate by Club / School / Performance source system.Not public yet
Current ITF / court-pace evidence where applicable Pending verified evidenceMatch the exact current product and classification.Not public yet
Infill + installation build-up Pending verified evidenceExact construction and line-marking method.Not public yet
Installation + maintenance manuals Pending verified evidenceCurrent issue matched to quoted construction.Not public yet
Warranty Pending verified evidenceExact product/system warranty.Not public yet

Document-control sequence

What happens when new supplier documents arrive.

01Identify exact product

Match the document to product/model, complete system, date or revision and intended sport.

02Check applicability

Confirm the test, certificate or warranty actually applies to the configuration Apollo may quote.

03Map to ATHREN

Link the source system internally to the correct ATHREN FIELD pathway without exposing private factory naming publicly.

04Release current information

Publish only the current project-relevant technical document or controlled summary and retain obsolete material internally.

Professional ATHREN FIELD workflow

Brief the project, structure the tender, then match the evidence.

ATHREN FIELD Project Brief Specifier & Tender Centre System Selection Guide Apollo Technical & Specifier Centre
Project