| Typical facility type | Dedicated hockey, Hockey5s, club, school and performance fields. | Dedicated or shared football fields, academies, clubs, schools and community facilities. | Dedicated or shared rugby fields, clubs, schools, academies and community grounds. | Shared school, council, club and training fields serving several activities. | Club, school, resort and recreational tennis courts using artificial-turf construction. |
|---|
| Water model | Dry / non-irrigated, water-based or dressed pathway depending on exact system. | Normally non-irrigated; drainage and heat management remain important. | Normally non-irrigated; drainage and complete impact system are central. | Normally non-irrigated; selected around sport mix and destination climate. | Normally non-irrigated; base drainage and infill strategy depend on exact system. |
|---|
| Shared-use suitability | Possible for selected community pathways, but hockey ball behaviour can limit broad multisport compromise. | Can suit shared community or school use where the exact system supports the secondary sports. | Shared football use may be possible, but rugby impact requirements should control system selection. | Designed around shared use; primary sport hierarchy must be explicit. | Usually a dedicated racquet-sport pathway rather than a field-sport multisport solution. |
|---|
| Maintenance intensity | Ranges from dry-system care to water-based operating and maintenance requirements; exact system controls. | Depends on filled, reduced-infill or non-infill construction and use intensity. | Typically requires disciplined inspection, brushing and infill/impact-system maintenance where applicable. | Should favour maintainable systems with clear responsibilities and accessible equipment. | Routine grooming, infill/line care where applicable and court cleaning depend on exact construction. |
|---|
| Certification pathway | FIH-related requirements tied to exact product/system and field. | FIFA-related requirements tied to exact system and completed field where required. | World Rugby Regulation 22 tied to exact tested system and finished field where required. | Usually project-specific; any included federation requirement must be checked against the shared-use system. | Any ITF classification or tender requirement tied to the exact current product evidence. |
|---|
| Typical project scale | Compact Hockey5s through full club, school and high-performance fields. | Training pitch through school, club and multi-field football precinct. | School or club field through larger shared-code and competition facilities. | Single school/community field through multi-field recreation precinct. | Single court through club, school and resort court groups. |
|---|
| Main early decision | Level of hockey and dry vs irrigated pathway. | Use intensity and filled vs non-infill strategy. | Impact requirement and rugby-only vs shared-code use. | Which sport is primary and how the line/equipment hierarchy will work. | Playing characteristics, infill/base strategy and whether turf is preferred over ATHREN COURT hard/cushioned systems. |
|---|