Skip to main content
Apollo NZ GlobalSPORT + KNOWLEDGE

SPORT + ACADEMY

Volleyball Academy

Plan the court, free zone and overhead volume as one global volleyball environment.

A 12-module global pathway based on current FIVB references, covering court geometry, free zones, clear height, floor, posts, lighting, dividers, multi-court halls, storage and project briefing.

Large multi-court sports facility suitable for volleyball
SELF-GUIDED12 MODULES
WHO IT IS FORSchools · Clubs · Universities · Councils · Resorts · Indoor venues · International projects
FORMATRead · Check · Apply
OUTCOMEA clearer project brief
Planning resource · Reviewed September 2026 · Final technical design and local compliance remain project-specific

How to use the Academy

Work through the decisions in order, then go deeper where the project needs it.

Each module gives you a planning outcome and a short set of questions to resolve. The linked guide provides the deeper technical context. You can follow the complete sequence or jump directly to the decision you are working on.

SPORT + ACADEMY is a practical education and planning resource. It is not a formal qualification, accreditation or professional-design substitute.

Direct answers

Understand the pathway before you start.

These short answers define the scope of the Academy and make the planning intent clear before you move into the modules.

01

What is the Volleyball Academy?

A 12-module global pathway based on current FIVB references, covering court geometry, free zones, clear height, floor, posts, lighting, dividers, multi-court halls, storage and project briefing.

02

Who is this Academy for?

This self-guided planning pathway is intended for Schools · Clubs · Universities · Councils · Resorts · Indoor venues · International projects. It is designed to support early project understanding before detailed product specification or local professional design.

03

What does the Academy cover?

The pathway contains 12 modules covering set the fivb court and free-zone baseline, define player groups and scheduling, plan the floor or outdoor base, choose the volleyball surface pathway, coordinate posts, sockets and net tension, protect clear height and overhead systems and the final project brief.

04

Is SPORT + ACADEMY a formal qualification or accreditation?

No. SPORT + ACADEMY is a practical education and planning resource. It does not provide formal accreditation and does not replace project-specific professional, engineering, safety or statutory advice.

PLANNING BOARD 12

Volleyball court + clear-space envelope

Court, free zone, unobstructed height, posts, net, referee position, circulation and multi-court spacing should be planned together.Conceptual planning diagram · not a construction drawing
18 × 9 m COURTnet · attack lines · service zonesFREE ZONE + UNOBSTRUCTED PLAYING HEIGHTREFEREEstand + scorer

Learning pathway

12 decisions that shape the facility.

Resolve the early project questions before detailed product specification. That reduces rework and makes later supplier, consultant and project-team conversations more useful.

01
MODULE 01

Set the FIVB court and free-zone baseline

What you need to decide

Start from the 18 × 9 m court and the appropriate free-zone and clear-height requirement for the intended level.

Information to collect

Recreation, school, club or international-standard venue?

What free-zone standard applies?

What unobstructed height is available?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
Module 1 of 12Next
02
MODULE 02

Define player groups and scheduling

What you need to decide

Match court count and equipment to training groups, classes, teams, tournaments and shared use.

Information to collect

How many simultaneous courts are needed?

What age and competition levels use the facility?

How quickly must courts convert between activities?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 2 of 12Next
03
MODULE 03

Plan the floor or outdoor base

What you need to decide

Review flatness, moisture, drainage, joints and existing conditions before choosing the surface.

Information to collect

Indoor slab or outdoor hard court?

Are moisture or level issues present?

Does the base need repair before surfacing?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 3 of 12Next
04
MODULE 04

Choose the volleyball surface pathway

What you need to decide

Select a surface around grip, cushioning, ball response, cleaning, portability and outdoor exposure.

Information to collect

Permanent, modular or roll-out?

What performance level is required?

How will the floor be cleaned and repaired?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 4 of 12Next
05
MODULE 05

Coordinate posts, sockets and net tension

What you need to decide

Resolve post system, net, antennae, protection and referee stand before the floor plan is frozen.

Information to collect

Fixed sockets or portable bases?

Where are post loads or anchors resolved?

Where will equipment store between sessions?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 5 of 12Next
06
MODULE 06

Protect clear height and overhead systems

What you need to decide

Keep lighting, ductwork, structure, scoreboards and other overhead elements clear of the playing volume.

Information to collect

What is the lowest overhead obstruction?

Do luminaires sit in problematic sightlines?

Are retractable systems required?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 6 of 12Next
07
MODULE 07

Plan lighting for ball visibility

What you need to decide

Coordinate light levels, glare, fixture position and backgrounds around high-ball play.

Information to collect

Training or competition use?

Are dark backgrounds or windows affecting visibility?

Can lighting support multiple courts evenly?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 7 of 12Next
08
MODULE 08

Plan divider curtains and multi-court spacing

What you need to decide

Allow simultaneous courts to operate without ball crossover, blocked run-off or unsafe circulation.

Information to collect

How many side-by-side courts?

Are retractable dividers needed?

Where are aisles and exits?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 8 of 12Next
09
MODULE 09

Plan team, scorer and spectator zones

What you need to decide

Coordinate benches, scorer table, officials, circulation and spectators outside the free zone.

Information to collect

Where do teams wait?

Is formal scoring required?

How do spectators enter without crossing play?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 9 of 12Next
10
MODULE 10

Plan storage and changeover

What you need to decide

Provide safe storage for posts, nets, padding, referee equipment and shared-sport hardware.

Information to collect

What equipment is removed daily?

Can heavy components move without crossing active courts?

Who owns setup and inspection?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 10 of 12Next
11
MODULE 11

Plan outdoor or covered variants

What you need to decide

Where volleyball is outside, coordinate drainage, wind exposure, UV, lighting and weather protection with the surface and equipment.

Information to collect

Is the court fully outdoor or covered?

What wind and rain exposure applies?

Does the project need shade or a future enclosure?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 11 of 12Next
12
MODULE 12

Build the volleyball project brief

What you need to decide

Bring court count, clearances, floor, posts, lighting, dividers, storage and local responsibilities into one brief.

Information to collect

Are court and clear-space dimensions confirmed?

Is the intended FIVB or local level clear?

What installation and approvals remain local?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.

SPORT + TOOLS

Apply what you have learned.

Use the planning tools when you are ready to translate the Academy modules into dimensions, comparisons and a structured project brief.

SPORT + KNOWLEDGE

Continue learning

Planning volleyball inside a shared sports hall?

Use the Multi-Sport Court Academy to coordinate line hierarchy, removable equipment, storage, lighting and other sports around the volleyball layout.

Open Multi-Sport Court Academy
Project