SPORT + KNOWLEDGE WORKBOOK

Volleyball Academy

This workbook mirrors the live Academy. Saved module decisions are inserted automatically; empty modules retain note space for workshops, meetings or site visits.
SPORT + KNOWLEDGE

Volleyball Academy

Global court, free-zone and hall planning workbook

LEARN · PLAN · PLAYAn Apollo NZ Global InitiativeReviewed September 2026

How to use this workbook

Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.

This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.

01
MODULE 01

Set the FIVB court and free-zone baseline

WHAT YOU NEED TO DECIDE

Start from the 18 × 9 m court and the appropriate free-zone and clear-height requirement for the intended level.

INFORMATION TO COLLECT

Recreation, school, club or international-standard venue?

What free-zone standard applies?

What unobstructed height is available?

RECORDED DECISION / NOTES
02
MODULE 02

Define player groups and scheduling

WHAT YOU NEED TO DECIDE

Match court count and equipment to training groups, classes, teams, tournaments and shared use.

INFORMATION TO COLLECT

How many simultaneous courts are needed?

What age and competition levels use the facility?

How quickly must courts convert between activities?

RECORDED DECISION / NOTES
03
MODULE 03

Plan the floor or outdoor base

WHAT YOU NEED TO DECIDE

Review flatness, moisture, drainage, joints and existing conditions before choosing the surface.

INFORMATION TO COLLECT

Indoor slab or outdoor hard court?

Are moisture or level issues present?

Does the base need repair before surfacing?

RECORDED DECISION / NOTES
04
MODULE 04

Choose the volleyball surface pathway

WHAT YOU NEED TO DECIDE

Select a surface around grip, cushioning, ball response, cleaning, portability and outdoor exposure.

INFORMATION TO COLLECT

Permanent, modular or roll-out?

What performance level is required?

How will the floor be cleaned and repaired?

RECORDED DECISION / NOTES
05
MODULE 05

Coordinate posts, sockets and net tension

WHAT YOU NEED TO DECIDE

Resolve post system, net, antennae, protection and referee stand before the floor plan is frozen.

INFORMATION TO COLLECT

Fixed sockets or portable bases?

Where are post loads or anchors resolved?

Where will equipment store between sessions?

RECORDED DECISION / NOTES
06
MODULE 06

Protect clear height and overhead systems

WHAT YOU NEED TO DECIDE

Keep lighting, ductwork, structure, scoreboards and other overhead elements clear of the playing volume.

INFORMATION TO COLLECT

What is the lowest overhead obstruction?

Do luminaires sit in problematic sightlines?

Are retractable systems required?

RECORDED DECISION / NOTES
07
MODULE 07

Plan lighting for ball visibility

WHAT YOU NEED TO DECIDE

Coordinate light levels, glare, fixture position and backgrounds around high-ball play.

INFORMATION TO COLLECT

Training or competition use?

Are dark backgrounds or windows affecting visibility?

Can lighting support multiple courts evenly?

RECORDED DECISION / NOTES
08
MODULE 08

Plan divider curtains and multi-court spacing

WHAT YOU NEED TO DECIDE

Allow simultaneous courts to operate without ball crossover, blocked run-off or unsafe circulation.

INFORMATION TO COLLECT

How many side-by-side courts?

Are retractable dividers needed?

Where are aisles and exits?

RECORDED DECISION / NOTES
09
MODULE 09

Plan team, scorer and spectator zones

WHAT YOU NEED TO DECIDE

Coordinate benches, scorer table, officials, circulation and spectators outside the free zone.

INFORMATION TO COLLECT

Where do teams wait?

Is formal scoring required?

How do spectators enter without crossing play?

RECORDED DECISION / NOTES
10
MODULE 10

Plan storage and changeover

WHAT YOU NEED TO DECIDE

Provide safe storage for posts, nets, padding, referee equipment and shared-sport hardware.

INFORMATION TO COLLECT

What equipment is removed daily?

Can heavy components move without crossing active courts?

Who owns setup and inspection?

RECORDED DECISION / NOTES
11
MODULE 11

Plan outdoor or covered variants

WHAT YOU NEED TO DECIDE

Where volleyball is outside, coordinate drainage, wind exposure, UV, lighting and weather protection with the surface and equipment.

INFORMATION TO COLLECT

Is the court fully outdoor or covered?

What wind and rain exposure applies?

Does the project need shade or a future enclosure?

RECORDED DECISION / NOTES
12
MODULE 12

Build the volleyball project brief

WHAT YOU NEED TO DECIDE

Bring court count, clearances, floor, posts, lighting, dividers, storage and local responsibilities into one brief.

INFORMATION TO COLLECT

Are court and clear-space dimensions confirmed?

Is the intended FIVB or local level clear?

What installation and approvals remain local?

RECORDED DECISION / NOTES

Facility Plan summary

Use this page to consolidate the project before moving into the Sports Project Brief.

Confirmed decisions
Items still to verify
Local professional / approval items
Next planning action
SPORT + KNOWLEDGEapollonzglobal.com/sport-knowledgePlanning guidance · Supply-only project pathway
Return to Academy
Project