Skip to main content
Apollo NZ GlobalStart a brief
Industrial doors & loading bays

SYSTEM 01 / Industrial access

Industrial Door Systems

A project-led pathway for sectional doors, steel and aluminium roller shutters, insulated openings and selected larger warehouse closures. The door is specified around real opening dimensions, duty, exposure and site operations.

Applications

Where this system fits.

Warehouse and distribution buildingsProduction and manufacturingVehicle workshops and depotsIndustrial building upgrades

01 / Selection inputs

What needs to be understood first.

  • Clear opening width/height, headroom and side room
  • Exposure, local wind design parameters and external pressures
  • Door opening frequency, required security and thermal intent
  • Panel or slat construction, track type and manual emergency access

02 / Indicative supply scope

What the package may include.

  • Door curtain/panels, frame, tracks and guides
  • Operator, control station and emergency operation as selected
  • Appropriate seals and safety devices
  • Manufacturer installation and maintenance information, if available

03 / Documentation to request

Evidence before commitment.

  • Maximum tested opening and construction schedule
  • Model-specific wind pressure and applicable test evidence
  • Operator voltage/frequency and safety architecture
  • Fixing loads, structural interface and shop drawings

04 / Local project interfaces

Responsibilities to coordinate.

  • Opening structure and fixing substrate
  • Electrical services and isolators
  • Local installer, commissioning and safety testing

Project supply, not a certified standard kit. TREVIK rapid-door and sectional-automation families remain linked as existing Apollo pathways. Manufacturer capabilities, maximum sizes, duty ratings, test certificates, drawings and warranties must be verified for the selected equipment before any binding performance claim or order.

Related Apollo pathways

Connect the complete loading-bay scope.

Have dimensions, a layout or a dock schedule?

Start simply or prepare a detailed technical brief if the project has reached specification stage.

Start an enquiry Detailed technical brief
Project