01 / Selection inputs
What needs to be understood first.
- Truck body height, width and rear-door operation
- Vehicle positioning and dock approach geometry
- Required thermal, weather and dust separation
- Fabric wear, compression limits and repair access
Start a brief SYSTEM 04 / Weather interface
Coordinate the truck-to-building junction to help manage rain, wind, dust and temperature exchange. Mechanical curtain shelters, inflatable shelters and compressible seals are not interchangeable.
Applications
01 / Selection inputs
02 / Indicative supply scope
03 / Documentation to request
04 / Local project interfaces
Project supply, not a certified standard kit. Project exposure and the real vehicle fleet govern seal selection. Manufacturer capabilities, maximum sizes, duty ratings, test certificates, drawings and warranties must be verified for the selected equipment before any binding performance claim or order.
Related Apollo pathways
Start simply or prepare a detailed technical brief if the project has reached specification stage.
Start an enquiry Detailed technical brief