Start with the audience and venue
Viewer distance, coverage, programme, camera use, speech/music balance, ambient light and operating model should drive technology selection.
International Specification Records / Global
HLJÓÐ projects combine sound, stage, lighting, LED, rigging, control and venue infrastructure. Use this centre to define audience, sightlines, environment, power, structure, acoustics, control and local specialist responsibilities before exact equipment is frozen.

Direct answer
For a performance or venue specification, define the venue type, audience, indoor/outdoor environment, sightlines, acoustic objective, screen and stage zones, rigging/structural interfaces, power, control/network requirements, service access, commissioning and local AV/electrical responsibilities before selecting final systems.
Project decision
Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.
Viewer distance, coverage, programme, camera use, speech/music balance, ambient light and operating model should drive technology selection.
Rigging, screen supports, speaker loads, power, data, ventilation, access and cable routes must be resolved with the venue rather than after equipment selection.
Photometric, acoustic, IP, EMC, electrical, structural and display-performance evidence must belong to the exact proposed product and configuration.
Apollo is supply-led. Local installation, electrical work, rigging sign-off, structural engineering, commissioning and statutory approvals remain separately defined unless expressly included.
Comparison matrix
Use the operating requirement to structure the system.
| Layer | Review | Apollo pathway |
|---|---|---|
| Sound | Coverage, SPL, speech/music, acoustics | Professional audio / acoustics |
| Stage & rigging | Loads, spans, points, changeover | Stage / truss / rigging |
| Lighting | Use, beam, colour, control, IP | Professional lighting |
| LED & vision | Sightlines, pitch, daylight, cameras | HLJÓÐ / FÍSVOR displays |
| Control & commissioning | Network, redundancy, operators | Project-specific integration |
Project brief
Frequently asked
No. Each technology has different performance, power, structure, control and evidence requirements, even when coordinated within one project.
Apollo is supply-led. Local installation, electrical work, rigging, commissioning and statutory responsibilities remain with the appointed specialist team unless expressly included.
Use the HLJÓÐ technical and specifier pathways plus the Apollo Technical & Specifier Centre for current registered documents and system-specific evidence.
Next step
Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.
Current technical documents
Use the product page and project brief for current information. CAD, BIM, test, certificate and technical files are provided when they apply to the exact selected system.