Regional specification questions
What changes for this destination?
The items below are review inputs, not substitute engineering calculations or regulatory approvals.
01Rainfall, drainage and surface conditions
Record covered or exposed use, existing asphalt or concrete condition, falls, ponding, proposed drainage and maintenance. Ask for model-specific outdoor suitability, rather than assuming every modular surface is permeable.
02Public-use and accessibility interfaces
Confirm the intended users, pedestrian routes, edge transitions, clearances, access and any local authority specification. Public-space compliance is established by the appointed US project team.
03Receiving and site constraints
Identify the state, delivery ZIP, urban or regional location, unloading capability, storage, local contractor and whether a programme must be staged around a live facility.