Skip to main content
Apollo NZ Global
Get a QuoteMy Project

North America / United States / Import & technical readiness

Plan the US import and technical handover before ordering.

A product price does not establish an import-ready project price. For a US school, developer, municipal purchaser or hospitality operator, the shipment needs a named importer of record, product-specific customs review, receiving arrangements and a local design/installation team. Apollo can review the product and documented freight offer; the buyer and appointed specialists manage the responsibilities specified in the contract.

Practical procurement sequence

Five checks before placing an international product order.

01

Identify the buyer and importer

Name the purchasing legal entity and the importer of record. Confirm which party engages the customs broker, holds the required importer identifiers and submits commercial entry information. Freight terms must state where Apollo's responsibility ends.

02

Confirm classification and trade measures

The US importer/broker determines the correct HTS classification, country of origin, applicable tariff and any product-specific regulatory requirements at the time of entry. Do not assume one duty percentage for all Apollo categories or that shipment from New Zealand means New Zealand origin.

03

Request exact model documentation

Match drawings and product schedules to selected model numbers. Ask for relevant structural testing, fire, electrical, coating, safety or material evidence based on the product and jurisdiction. Unverified certification or local code approval must not be promised.

04

Establish site and installation scope

Appointed local engineers, authorities and contractors determine anchorage, electrical interfaces, accessibility, civil work, permit needs and installation methods. For recreation facilities, plan accessible routes early.

05

Specify all delivery interfaces

Record destination state and ZIP, port or depot where relevant, unloading constraints, goods receiving hours, packaging, damage inspection, spare parts and who handles transport after the agreed handover point.

Official reference documents

Check the source, not assumptions.

These official sources are useful starting points; requirements must be checked again when the particular goods are imported or the project is designed.

Project intake

What Apollo needs from the purchasing team.

01

Company, state, ZIP code and project site

02

Product model(s), dimensions, quantity and origin information where confirmed

03

Local designer/installer, test or compliance evidence required

04

Named importer/broker, proposed freight handover and receiving arrangements

05

Target procurement dates and any bid requirements

US state and local requirements are reviewed for the actual product and project. A US project quotation is not a claim of US certification, licensed installation or warehoused stock.

Request quotation review →
Project