One field procurement checklist. Clear responsibilities.

For football, hockey and rugby projects, use the same practical schedule to identify what Apollo can supply or coordinate, what the local design and installation team must provide, and which interfaces require joint approval. No document is treated as issued or approved merely because it appears here.

Apollo / supply partner

Proposed product schedule, applicable manufacturer drawings, technical information, packing documents and manuals as agreed for the exact quoted goods.

Local project team

Site surveys, civil/foundation design, consents, electrical and water services, installation, local inspections and any installed-field testing.

Joint confirmation

Final interfaces, document gaps, order scope and exclusions, site receiving responsibilities and handover conditions before release.

01 / SET THE SCOPE

Select the sport and supply systems.

Only relevant document rows are shown. This is a readiness checklist—not evidence that any particular product, performance certification or installation has been approved.
Include these supply systems
Current scopeFootball · 6 selected system layers · 20 applicable document rowsReturn to complete facility planner

02 / DOCUMENT RESPONSIBILITIES

A consistent schedule for every field project.

The responsible party column describes who must supply or coordinate the document. Actual availability and any supplier exclusions are established in the project-specific quotation and submittal register.
Apollo / supply partner9
Local project team8
Joint confirmation3
Local items marked available0 / 8
Only local-team rows have checkboxes. Tick an item only when the information is ready to share; Apollo and joint rows remain subject to later review.

Apollo / supply partner

9 documents in view
Required document / scheduleWhat is expectedWhen neededReadiness
Itemised proposed product and supply scheduleAgreed models, quantities, options, accessories and written inclusions/exclusions. Issued during quotation development.Before quotationConfirm in quote / submittals
Exact-model technical data and supplier drawingsCurrent datasheets, system configurations, available dimensions and relevant manufacturer installation interfaces for selected goods.Before manufacture / dispatchConfirm in quote / submittals
Playing-surface test and product evidenceCurrent matching product/system reports where applicable. Separate completed-field testing is not included by default.Before manufacture / dispatchConfirm in quote / submittals
Goals/posts and restraint detailsSupplier dimensions, anchoring/socket interfaces and available model-specific safety information.Before manufacture / dispatchConfirm in quote / submittals
Luminaire specification and available photometric filesProposed fixture schedule, controls, supplier optics/IES/LDT files and photometric proposal when in supply scope.Before manufacture / dispatchConfirm in quote / submittals
Fencing and containment component packageProposed post/net/fence components, dimensions and available supplier drawings for stated site conditions.Before manufacture / dispatchConfirm in quote / submittals
Seating, shelter and cover submittal packageProposed model layout, capacity and manufacturer drawings/calculations where available and within confirmed supply.Before manufacture / dispatchConfirm in quote / submittals
Packing, freight and product delivery documentsAgreed packing list, shipping/dispatch documents, handling instructions and delivery scope for goods actually ordered.At delivery / handoverConfirm in quote / submittals
Manufacturer care, warranty and maintenance packApplicable product manuals, warranties/exclusions and maintenance information supplied for the exact delivered models.At delivery / handoverConfirm in quote / submittals

Local project team

8 documents in view
Required document / scheduleWhat is expectedWhen neededReadiness
Site survey and project design briefSite plans, dimensions, use level, field set-out, climate and constraints supplied by client/consultant.Before quotation
Existing base, drainage and ground reportLevels, subgrade/base/drainage investigations, retained shock-layer condition and remedial design if applicable.Before quotation
Applicable competition and consent requirementsEvent/tender level, local statutory standards, consent, accessibility, fire, spectator and safety criteria.Before quotation
Local foundations, anchors and set-out approvalStructural/foundation design, ground bearing, post/socket locations, wind loads and sign-off by local professionals.Before manufacture / dispatch
Electrical, power and lighting approvalPole foundations, final photometric acceptance, supply/network connection, cabling and local electrical certification.Before manufacture / dispatch
Spectator circulation, accessibility and structureFinal capacity, egress, accessible routes, local structural approvals and venue/fire compliance.Before manufacture / dispatch
Local construction and installation methodCivil works, foundations, building and electrical work, installers, methods, inspection and on-site safety ownership.Before manufacture / dispatch
Installation, commissioning and field acceptanceLocal installer sign-off, inspections, as-built records, functional commissioning and independent field testing if required.At delivery / handover

Joint confirmation

3 documents in view
Required document / scheduleWhat is expectedWhen neededReadiness
Coordinated interface and scope sign-offConfirm shared drawings, quantities, survey dimensions, trade interfaces, excluded works, permitted substitutions and changes before order.Before manufacture / dispatchJoint release gate
Site receiving, unloading and storage planAgree delivery point and Incoterms/terms, site access, unloading equipment, secure storage and damage reporting before shipment.Before manufacture / dispatchJoint release gate
Final handover and outstanding-items registerAgree shortages, defects, spares, warranty contacts, owner responsibilities and handover records.At delivery / handoverJoint release gate

03 / FROM CHECKLIST TO QUOTATION

Agree responsibilities before the order is released.

Any outstanding local inputs, conditional manufacturer reports, contract exclusions, shipping responsibilities, exact-model warranty terms and independent field-test obligations must be resolved with the project team.
0 of 8 local documents indicated as available

Carry your selected systems and checklist responses into a branded preliminary specification PDF, or continue directly into the existing facility supply brief. Nothing is sent until you complete the enquiry.

Print for an initial meeting or save as PDF through your browser. This is an unapproved planning schedule, not a final purchase order.