Use this centre to see where certification, testing, engineering and local approval sit across the LUTHVAR complete-facility programme.
MASTER RULES
Keep the evidence attached to the exact product and installed outcome.
The LUTHVAR package name does not transfer certification from one supplier product to another.
Where a governing body certifies both products and installed facilities, both stages are treated separately.
Manufacturer test reports apply only to the exact product/configuration and stated test scope.
Local structural, civil, electrical, fire, accessibility and building responsibilities remain with the appointed project professionals unless expressly included.
Public compliance wording is only used when current evidence supports the exact supplied system.
PROGRAMME EVIDENCE GATES
Each sport has its own technical route.
These notes are planning controls. The project review still checks the current governing-body documents, exact supplier evidence and destination requirements before a commercial specification is released.
LUTHVAR COMPLETE + ATHREN FIELD
Build complete outdoor field-sport facilities beyond a single code or surface.
Field-sport standards differ by code and competition level. LUTHVAR treats football, rugby, hockey, lacrosse, baseball/softball and shared-use requirements separately inside the same project architecture.
Primary and secondary sports defined before surface and line-marking selection.
Exact sport equipment and governing-body evidence checked model by model.
Shared-use conflicts in run-offs, anchors, lighting and storage resolved.
Field civil/drainage and local installation responsibilities defined.
Build the hockey field as a complete playing, lighting, containment and spectator system.
FIH field certification uses independent testing and checks the installed turf against the approved product as well as dimensions, line marking, slope and drainage.
Exact FIH Approved Product / certification pathway where required.
Field dimensions, line marking, slope and drainage coordinated with certification target.
Water/irrigation strategy confirmed where applicable.
Lighting, containment and spectator structures engineered project-by-project.
Develop the track, field events, timing, lighting and spectator infrastructure as one athletics facility.
World Athletics maintains separate certification lists and procedures for athletics facilities, track surfacing products, competition equipment and throwing implements.
Track surfacing product certification matched to exact current system.
Facility certification pathway identified where required.
Competition equipment / implements matched to current certified lists where required.
Event geometry, cages, foundations and safety zones resolved before procurement.
Build cricket practice, academy and ground infrastructure as complete facility packages.
Cricket facility requirements vary by competition, national association, indoor/outdoor use and project type, so exact local or governing-body criteria are confirmed during project review rather than applied as a universal package claim.
Practice lane geometry and containment confirmed against intended use.
Outdoor cages/netting engineered for site wind and foundations.
Lighting and indoor-building interfaces resolved.
Score/video and training technology scope frozen before procurement.
Develop the hall around the sports programme, not just the building shell.
Sport England's current multi-sports hall guidance uses 34.5 × 20 m or larger as the revised four-court hall starting size for appropriate school/community club competition and recommends planning around the relevant governing-body requirements.
Hall geometry checked against intended sport/competition requirements.
Clear height and run-offs resolved before structure is frozen.
Floor system matched to sockets/equipment/substrate and sport performance.
Lighting, acoustics, storage and building services coordinated together.
Coordinate the competition equipment, timing, display and spectator systems around the aquatic facility.
Aquatic competition requirements depend on the exact sport, event level and current World Aquatics / national federation rules, so equipment and facility evidence are matched project-by-project.
Competition level and governing-body requirements identified.
Starting / lane / goal models matched to exact current evidence.
Timing interfaces coordinated with pool/deck construction.
Humidity/corrosion pathway confirmed for displays, seating and structures.
Develop climbing, bouldering and movement facilities as complete safety-led projects.
Climbing facilities require specialist wall and safety design; applicable climbing-wall, competition and local safety standards are confirmed against the project type rather than assumed across all facilities.
Wall structural / anchor design matched to exact system and building structure.
Impact flooring matched to wall/activity configuration.
Belay / speed / competition equipment evidence confirmed where applicable.
Operator procedures, supervision and rescue requirements defined.
Build gymnastics, tumbling, cheer and movement spaces as complete training facilities.
For formal competition, apparatus requirements are matched to the current World Gymnastics/FIG Apparatus Norms and exact approved equipment rather than inferred from training products.
Exact apparatus model and current competition approval/norm evidence where required.
Pit / floor / impact systems coordinated with structural slab and building geometry.
Clear heights and apparatus safety zones frozen before hall structure.
Storage and equipment movement planned from the outset.
Expand RIDEspan from pump tracks into complete wheeled-recreation destinations.
Active-recreation projects are product- and jurisdiction-specific; applicable cycling/skate facility standards, local authority requirements and exact supplier evidence are confirmed during project review.
Use real RIDEspan product geometry / imagery where available.
Foundation / support and local civil requirements confirmed.
Street/skate features sourced from suitable specialist supplier with exact evidence.
Lighting, shade and public-realm foundations coordinated with the site.
Complete the facility with the systems needed to operate, maintain and hand it over.
Operations requirements are driven by the exact installed systems and local venue obligations; LUTHVAR packages the supplier maintenance information rather than replacing the venue operator's responsibilities.
Operations pack matched to exact systems actually supplied.
Spare-parts availability and warranty conditions documented.
Maintenance equipment compatible with selected surfaces/equipment.
Training and commissioning deliverables agreed before handover.
Connect athlete testing, training feedback and venue displays without creating another standalone brand.
Performance technology is device- and use-case specific; measurement claims, calibration, software and data integrations are only stated where exact supporting evidence is available.
Exact device accuracy / validation claims checked before publishing.
Software licensing, subscriptions and update/support terms confirmed.
Data/privacy and athlete-record responsibilities defined by client/operator.
Third-party integrations verified rather than assumed.
Select the surface as part of the complete sport system, not by material name alone.
Surface certification is sport- and system-specific: football, rugby, hockey and athletics use different governing-body programmes, and installed-field/facility testing may be required in addition to product evidence.
Exact surface product and full system construction identified.
Substrate/base tolerances and drainage/moisture requirements confirmed.
Shockpad/underlay treated as part of complete system where applicable.
Current governing-body certification verified before public claim.