Skip to main content
Apollo NZ GlobalStart Project Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR COMPLETE

LUTHVAR COMPLETE · CRICKET GROUNDS & TRAINING CENTRES

Build cricket practice, academy and ground infrastructure as complete facility packages.

Cricket packages combine practice lanes or match-ground infrastructure with surfaces, cages/netting, sight screens, shelters, lighting, scoring/display, pavilions, performance training and operations.

SchoolsCricket clubsAcademiesUniversitiesCouncilsCricket federations
Complete cricket training centre with multiple practice lanes and support infrastructure

STANDARD PATHWAYS

Four practical starting packages.

These are scope pathways, not fixed certified kits. Final dimensions, models, evidence and local responsibilities are project-specific.

01SCHOOL / CLUB PRACTICE

School / Club Practice

Schools · community clubs

One/two-lane durable practice systems with storage and safe containment.

Core
  • Practice lane(s)
  • Cage / netting
  • Practice surface
  • Storage
Optional
  • Lighting
  • Small pavilion
Build this brief
02CRICKET ACADEMY

Cricket Academy

Academies · performance programmes

Multi-lane performance centre with coaching, technology and TORVYR support.

Core
  • Multi-lane nets
  • Performance surfaces
  • Lighting
  • Coaching/video interfaces
  • Storage
Optional
  • TORVYR performance gym
  • Classroom / analysis
Build this brief
03INDOOR CRICKET CENTRE

Indoor Cricket Centre

Year-round training facilities

Indoor lanes, retractable dividers, lighting, flooring and building-service coordination.

Core
  • Indoor lanes
  • Retractable netting
  • Indoor flooring
  • Lighting
  • Building interfaces
Optional
  • Spectator / viewing
  • TORVYR
Build this brief
04CLUB / REGIONAL CRICKET GROUND

Club / Regional Cricket Ground

Clubs · councils · federations

Ground package connecting wickets/practice, sight screens, shelters, scoring, pavilion and spectators.

Core
  • Ground infrastructure
  • Practice nets
  • Sight screens
  • Team shelters
  • Score/display
  • Pavilion
  • Operations
Optional
  • Grandstand
  • FÍSVOR video
  • Covered seating
  • Performance centre
Build this brief

SYSTEM STACK

Coordinate the facility layer by layer.

Every module keeps its own technical evidence and local interfaces while the project brief brings them together.

PROJECT SEQUENCE

Freeze the project in the right order.

Use the programme first, then geometry, system selection, evidence and local responsibilities.

01

Define cricket programme

Set school, club, academy, indoor or match-ground objectives and player throughput.

02

Choose practice / field model

Resolve lanes, wickets, nets, indoor/outdoor context and operating hours.

03

Add performance infrastructure

Lighting, video, TORVYR, buildings and spectator/support systems.

04

Freeze safety & operations

Confirm netting, access, storage, maintenance, local requirements and handover.

EVIDENCE & STANDARDS

Keep claims attached to the exact product and installed outcome.

Cricket facility requirements vary by competition, national association, indoor/outdoor use and project type, so exact local or governing-body criteria are confirmed during project review rather than applied as a universal package claim.

  • Practice lane geometry and containment confirmed against intended use.
  • Outdoor cages/netting engineered for site wind and foundations.
  • Lighting and indoor-building interfaces resolved.
  • Score/video and training technology scope frozen before procurement.
  • Local cricket association / competition requirements checked where relevant.

NEXT STEP

Turn the pathway into a project-specific scope.

The dedicated brief captures the use level, destination, site, users, capacity and system layers before commercial quotation.

Start project brief
Project