Skip to main content
Apollo NZ GlobalStart Project Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR COMPLETE · Aquatic Systems

LUTHVAR · COMPETITION AQUATICS

Coordinate the pool, water engineering, competition equipment and venue technology as one aquatic system.

LUTHVAR Competition Aquatics covers 25 m and 50 m pool pathways, hydraulic plant, competition equipment, movable systems, water polo, artistic swimming, timing, HLJÓÐ aquatic audio, FÍSVOR displays and technical project documentation. Final engineering, exact product evidence and certification pathways remain project-specific.

Aquatic centresSchoolsUniversitiesCouncilsClubsDevelopersCompetition venues
Competition aquatic centre with lap pool, starting blocks, lane systems, timing, results display and spectator seating

STANDARD PATHWAYS

Four practical starting packages.

These are scope pathways, not fixed certified kits. Final dimensions, models, evidence and local responsibilities are project-specific.

01TRAINING / COMMUNITY AQUATICS

Training / Community Aquatics

Schools · training · community

25 m or project-specific pool pathway with water engineering, training equipment and future competition readiness.

Core
  • 25 m / project pool pathway
  • Hydraulics & treatment
  • Training lane systems
  • Operations / storage
Optional
  • Warm-up pool
  • Small seating
  • Future timing
Build this brief
02COMPETITION AQUATICS

Competition Aquatics

Clubs · competition facilities

Pool structure, plant, starting/lane systems, timing readiness and venue technology coordinated for competition use.

Core
  • Pool structure
  • Hydraulics & treatment
  • Starting / lane equipment
  • Timing readiness
  • FÍSVOR option
Optional
  • Water polo
  • Covered seating
  • Dryland training
Build this brief
03REGIONAL / NATIONAL AQUATIC VENUE

Regional / National Aquatic Venue

Regional · national venues

Competition-led pool, plant, equipment, timing, FÍSVOR, HLJÓÐ and spectator systems with enhanced technical documentation.

Core
  • Competition pool system
  • Competition equipment
  • Timing / results
  • FÍSVOR
  • HLJÓÐ
  • Spectator systems
  • Technical submittals
Optional
  • Movable bulkhead
  • Movable floor
  • Warm-up pool
  • Hospitality
Build this brief
04INTERNATIONAL / MULTI-SPORT AQUATICS

International / Multi-Sport Aquatics

Major · international · multi-discipline venues

50 m and/or multi-pool pathway with discipline overlays, movable systems, major technology and enhanced certification/project review.

Core
  • 50 m / multi-pool system
  • Movable systems pathway
  • Water-polo / artistic overlays
  • Redundant timing/results
  • HLJÓÐ aquatic audio
  • Major FÍSVOR displays
  • Enhanced technical review
Optional
  • Broadcast / media
  • Event overlay
  • Major spectator infrastructure
  • Additional training / support
Build this brief

VISUAL PLANNING EVIDENCE

Keep every facility visibly tied to the actual sport.

These references show the sport-specific equipment, activity zones and venue context that should remain recognisable throughout planning and presentation.

Competition aquatic venue with lanes, starting systems, results display and spectators
Complete aquatic centre

The pool is only one layer of the facility.

Pool structure, plant, sport equipment, timing, display, audio, officials and spectators need to be coordinated around one project brief.

Competition swimming pool with lane ropes, backstroke flags and timing-ready end panels
Swimming

Competition equipment must align with the pool construction.

Starting systems, lane anchors, backstroke systems and timing interfaces should be frozen with deck and pool geometry rather than added later.

Water-polo action at a regulation-style floating goal with one ball in active play
Multi-discipline

Water polo and artistic swimming create distinct event modes.

Goals, field geometry, underwater audio, officials, scoring and changeover requirements are treated as separate discipline pathways inside the wider aquatic programme.

SYSTEM STACK

Coordinate the facility layer by layer.

Every module keeps its own technical evidence and local interfaces while the project brief brings them together.

01LUTHVAR Aquatics

Pool Structure

25 m, 50 m, warm-up and project-specific competition/training pool pathways coordinated with deck, overflow and structural interfaces.

Pool structure, materials, design life, loads and completed references must be supported by the selected manufacturing platform.
Explore system
02LUTHVAR Aquatics

Hydraulics & Water Treatment

Circulation, filtration, balance tanks, disinfection, heating interfaces and plant-room coordination.

Hydraulic calculations and final equipment sizing remain project-specific.
Explore system
03LUTHVAR

Competition Equipment

Starting blocks, backstroke systems, lane ropes, anchors, event markers and timing interfaces.

Exact governing-body and model requirements must be confirmed for the intended competition level.
Explore system
04LUTHVAR Aquatics

Movable Pool Systems

Movable bulkheads, movable floors and variable-use pool configurations where required.

Structural, mechanical, control and operating interfaces require project-specific engineering.
Explore system
05LUTHVAR

Water-Polo Configuration

Goals, field geometry, anchors, scoring and event-mode equipment.

Exact event specification and pool interfaces remain project-specific.
Explore system
06Specialist timing + FÍSVOR

Timing & Results

Touch/timing interfaces, results control, scoreboards and event display.

Timing-system compatibility and competition requirements must be matched to the exact selected systems.
Explore system
07HLJÓÐ

Aquatic Audio & Event Control

Underwater sound, pool-deck PA, officials/coach audio and event-control interfaces for aquatic venues.

IP, electrical isolation, acoustic performance and event requirements must be supported by exact-system evidence.
Explore system
08LUTHVAR + SARENTA + TORVYR

Spectators & Venue Support

Poolside spectators, cover, dryland training, operations and support infrastructure.

Corrosion, structure, accessibility, egress and local building requirements apply.
Explore system
09LUTHVAR

Architect & Specifier Package

Drawings, structural/hydraulic evidence, equipment schedules, CAD/BIM where available, submittals and project responsibility definition.

Supplier brochures are not treated as engineering evidence; exact documents are verified before release.
Explore system

PROJECT SEQUENCE

Freeze the project in the right order.

Use the programme first, then geometry, system selection, evidence and local responsibilities.

01

Define aquatic programme

Set pool length, use level, disciplines, depth strategy, warm-up requirements and competition objective.

02

Freeze pool + plant

Resolve pool structure, deck/overflow interfaces, hydraulics, filtration, treatment and movable-system requirements.

03

Coordinate sport + technology

Add competition equipment, timing, FÍSVOR, HLJÓÐ, spectators and discipline-specific systems.

04

Complete technical review

Match exact product evidence, drawings, engineering responsibilities and the intended governing-body / facility-certification pathway.

EVIDENCE & STANDARDS

Keep claims attached to the exact product and installed outcome.

Competition aquatic requirements depend on the exact sport, event level, facility configuration and current World Aquatics / national federation rules. LUTHVAR therefore separates product evidence from project-specific facility engineering and certification.

  • Pool type, length, depth and competition objective defined before product selection.
  • Pool structure and hydraulic design supported by project-specific engineering evidence.
  • Starting, lane, goal, movable and timing systems matched to exact current product evidence.
  • Underwater audio and aquatic electrical interfaces verified for the selected system and destination.
  • Humidity/corrosion pathway confirmed for technology, seating and structures.
  • Local aquatic safety, accessibility, structural, civil, electrical, plumbing, installation and approval responsibilities assigned.
  • No generic World Aquatics certification claim is made for a product package; certification objectives are handled project-by-project.

NEXT STEP

Turn the pathway into a project-specific scope.

The dedicated brief captures the use level, destination, site, users, capacity and system layers before commercial quotation.

Start project brief
Project