Skip to main content
Apollo NZ GlobalStart Project Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR · AQUATIC WATER ENGINEERING

Coordinate circulation, filtration and treatment as part of the pool system—not as an afterthought.

The water-engineering package defines the hydraulic and plant interfaces needed for the selected competition, training or multi-use pool. Final equipment sizing and calculations depend on the actual project.

Conceptual swimming facility alongside filtration vessels and circulation pipes in an enclosed mechanical plant room

SYSTEM SCOPE

Coordinate each layer before procurement.

01

Hydraulic design

Define flows, turnover objectives, suction/return arrangement and plant interfaces.

  • Design-flow basis
  • Return and suction strategy
  • Overflow / surge interfaces
  • Hydraulic calculations
02

Filtration

Select commercial filtration around loading, water quality, maintenance and project requirements.

  • Filter system
  • Pumps
  • Backwash strategy
  • Plant-room layout inputs
03

Treatment

Coordinate disinfection, chemical control and monitoring with the operating brief.

  • Primary disinfection
  • Chemical dosing
  • Water-quality monitoring
  • Control interfaces
04

Thermal & controls

Coordinate heating and plant controls with MEP responsibilities.

  • Heat exchanger interface
  • Temperature targets
  • Control strategy
  • Power and BMS interfaces

PROJECT VERIFICATION

Technical claims stay tied to the exact project and supplied system.

  • No generic filtration package is presented as suitable for every pool.
  • Turnover, flow and treatment calculations require the final pool geometry and operating brief.
  • Local water-quality, health and electrical requirements remain project-specific.

NEXT

Move from pathway to project scope.

50 m Competition PoolsAquatic Technical CentreStart Project Brief
Project