Skip to main content
Apollo NZ GlobalStart Project Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR · AQUATIC WATER ENGINEERING

Coordinate circulation, filtration and treatment as part of the pool system—not as an afterthought.

The water-engineering package defines the hydraulic and plant interfaces needed for the selected competition, training or multi-use pool. Final equipment sizing and calculations depend on the actual project.

Competition aquaticsPool · Plant · Sport · Technology

SYSTEM SCOPE

Coordinate each layer before procurement.

01

Hydraulic design

Define flows, turnover objectives, suction/return arrangement and plant interfaces.

  • Design-flow basis
  • Return and suction strategy
  • Overflow / surge interfaces
  • Hydraulic calculations
02

Filtration

Select commercial filtration around loading, water quality, maintenance and project requirements.

  • Filter system
  • Pumps
  • Backwash strategy
  • Plant-room layout inputs
03

Treatment

Coordinate disinfection, chemical control and monitoring with the operating brief.

  • Primary disinfection
  • Chemical dosing
  • Water-quality monitoring
  • Control interfaces
04

Thermal & controls

Coordinate heating and plant controls with MEP responsibilities.

  • Heat exchanger interface
  • Temperature targets
  • Control strategy
  • Power and BMS interfaces

EVIDENCE GATE

Claims stay tied to the exact project and supplied system.

  • No generic filtration package is presented as suitable for every pool.
  • Turnover, flow and treatment calculations require the final pool geometry and operating brief.
  • Local water-quality, health and electrical requirements remain project-specific.

NEXT

Move from pathway to project scope.

50 m Competition PoolsAquatic Technical CentreStart Project Brief
Project