Skip to main content
Apollo NZ GlobalStart Project Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR · AQUATIC ARCHITECT & SPECIFIER CENTRE

One technical pathway for pool structure, hydraulics, competition systems and venue interfaces.

The Aquatic Technical Centre defines what documentation should be available before an Apollo competition-aquatics package is frozen for quotation or project submittal.

Competition aquaticsPool · Plant · Sport · Technology

SYSTEM SCOPE

Coordinate each layer before procurement.

01

Pool & structure

Project drawings and structural interfaces for the selected pool system.

  • Plans / sections / elevations
  • Structural loads and interfaces
  • Foundation / slab requirements
  • Material and corrosion data
02

Hydraulics & plant

Evidence for circulation, filtration, treatment and plant-room coordination.

  • Hydraulic calculations
  • Flow / turnover basis
  • Equipment schedules
  • Plant-room layouts
03

Competition systems

Technical evidence for starting, lanes, timing, movable systems and discipline-specific equipment.

  • Product datasheets
  • Exact-model certificates
  • Interface drawings
  • Competition-level evidence
04

Project submittal

Package information into a coordinated architect, consultant and contractor review set.

  • CAD / DWG
  • BIM / Revit where available
  • Electrical / control interfaces
  • Installation and O&M documentation

EVIDENCE GATE

Claims stay tied to the exact project and supplied system.

  • Supplier brochures alone are not treated as engineering evidence.
  • Current certificates and test reports must match the exact proposed product.
  • Factory/source identities remain internal unless specifically approved for public use.
  • Local design sign-off, installation, commissioning and authority approvals remain project-specific unless expressly included.

NEXT

Move from pathway to project scope.

50 m Competition PoolsPool Water EngineeringStart Project Brief
Project