Skip to main content
Apollo NZ GlobalStart Project Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR COMPLETE

LUTHVAR · GYMNASTICS & MOVEMENT SYSTEMS

Build gymnastics, tumbling, cheer and movement spaces as complete training facilities.

Gymnastics packages coordinate apparatus, sprung floors, pits, mats, run-ups, storage, spectator zones and building clearances around the actual programme.

Gymnastics clubsSchoolsUniversitiesCouncilsCheer / tumbling programmesRegional competition centres

STANDARD PATHWAYS

Four practical starting packages.

These are scope pathways, not fixed certified kits. Final dimensions, models, evidence and local responsibilities are project-specific.

01SCHOOL MOVEMENT GYM

School Movement Gym

Schools · education

Flexible movement, tumbling and introductory gymnastics.

Core
  • Movement floor
  • Mats
  • Intro apparatus
  • Storage
Optional
  • Parkour
  • TORVYR
Build this brief
02CLUB GYMNASTICS CENTRE

Club Gymnastics Centre

Gymnastics / cheer clubs

Dedicated club gym with apparatus, pits, sprung floor and storage.

Core
  • Sprung floor
  • Apparatus
  • Pits / landing
  • Tumbling
  • Storage
  • Changing
Optional
  • Cheer
  • Parkour
  • Viewing
Build this brief
03REGIONAL TRAINING CENTRE

Regional Training Centre

High-performance training

Larger training centre with multiple apparatus, athlete support and performance areas.

Core
  • Expanded apparatus
  • Multiple pits
  • Performance training
  • Video/display option
  • Athlete support
Optional
  • Sports science
  • TORVYR
Build this brief
04COMPETITION GYMNASTICS VENUE

Competition Gymnastics Venue

Regional / national competition

Competition-oriented venue with certified apparatus pathway, spectators and event systems.

Core
  • Competition apparatus
  • Competition floor
  • Spectators
  • FÍSVOR
  • Lighting
  • Officials
  • Warm-up
Optional
  • Broadcast
  • Retractable seating
  • Hospitality
Build this brief

SYSTEM STACK

Coordinate the facility layer by layer.

Every module keeps its own technical evidence and local interfaces while the project brief brings them together.

PROJECT SEQUENCE

Freeze the project in the right order.

Use the programme first, then geometry, system selection, evidence and local responsibilities.

01

Set programme

Define artistic gymnastics, tumbling, cheer, parkour, school movement or competition use.

02

Freeze apparatus layout

Resolve clear height, pits, run-ups, floor zones and storage.

03

Coordinate structure

Hall, anchors, pits, services and equipment storage follow the layout.

04

Add spectators / event systems

Seating, lighting, display and athlete-support layers scale with competition use.

EVIDENCE & STANDARDS

Keep claims attached to the exact product and installed outcome.

For formal competition, apparatus requirements are matched to the current World Gymnastics/FIG Apparatus Norms and exact approved equipment rather than inferred from training products.

  • Exact apparatus model and current competition approval/norm evidence where required.
  • Pit / floor / impact systems coordinated with structural slab and building geometry.
  • Clear heights and apparatus safety zones frozen before hall structure.
  • Storage and equipment movement planned from the outset.
  • Local building, fire, accessibility and installation responsibilities assigned.

NEXT STEP

Turn the pathway into a project-specific scope.

The dedicated brief captures the use level, destination, site, users, capacity and system layers before commercial quotation.

Start project brief
Project