Cheer & Performance facility technical centre.

Cheer and performance facilities combine floor performance, tumbling/landing safety, clear height, team circulation, music/scoring and spectator/event operations. Training floors and competition floors should be planned around the relevant discipline rather than generic multipurpose-room assumptions.

Apollo Technical Reference · Edition 2026.1 · Governing references reviewed October 2026 · always verify the current competition documents for final design.
Cheer & Performance facility technical reference
01Cheer + Performance Cheer
022026 ICU safety rules
03Approx. 12.8 × 12.8 m ICU Cup performance floor reference
04Floor + clear-height + storage critical

HOW TO USE THIS CENTRE

Rules tell you how the sport is played. A facility has to make those rules work in a real building or site.

This page connects playing geometry to structure, surfaces, equipment, lighting, spectators, accessibility, storage, technology, testing and maintenance. It does not replace the governing body, local engineer, architect or statutory authority; it makes the interfaces visible before procurement.

INTERACTIVE FACILITY MAP

See the cheer & performance facility as one connected system.

Select a layer to see why it matters. This is a conceptual coordination map—not a dimensioned court, field, structural or compliance drawing.

CHEER & PERFORMANCEPLAYING AREA
FACILITY ENVELOPE · CIRCULATION · TECHNICAL INTERFACES
SPORT→SURFACE→EQUIPMENT→STRUCTURE→LIGHT→SPECTATORS→TECHNOLOGY→OPERATIONS

FACILITY LEVEL MATRIX

The technical brief changes with the level of venue.

Do not copy elite-event requirements into every community project—or under-specify a competition venue from a school checklist.

01Schools · councils · participation

Community / education

School/community performance area with safe floor and supervised movement zones.

02Clubs · academies · universities

Club / academy

Club/academy hall with dedicated floor, tumbling/training systems and storage.

03Regional · national competition

Competition

Competition-capable venue aligned to current ICU discipline and event requirements.

04International · professional · broadcast

Elite / major venue

Major event hall with show floor, warm-up, spectators, audio, displays and professional operations.

12 TECHNICAL TOPICS

Design the complete cheer & performance environment.

Each topic is part of the same facility. Changing one layer can affect several others, which is why product selection should follow the complete brief.

01

Playing geometry

Define the exact cheer/performance discipline, floor size, boundary, warm-up and team holding areas from the current event brief.

02

Surface / playing system

Competition/training floors may use different sprung, mat or performance-surface systems; impact and joint stability need to match the discipline.

03

Sport equipment

Mats, sprung systems, training aids, tumbling systems and music/event equipment require safe setup and storage.

04

Lighting

Provide even visibility without glare in upward athlete sightlines and without camera flicker at events.

05

Spectators

Separate performance/warm-up/team zones from spectators while maintaining clear event circulation and accessible viewing.

06

Structure + building interface

Clear height, roof services, rigging and floor/slab interface should be coordinated around lifts/tosses and equipment.

07

Environment

Ventilation, temperature, humidity and chalk/cleaning conditions affect comfort and floor performance.

08

Accessibility

Plan inclusive/adaptive participation and accessible spectator routes where the programme requires them.

09

Storage + changeover

Roll floors, mats, training aids, sound equipment and event furniture need large, nearby storage and safe handling.

10

Technology + controls

Music playback, scoring/judging, cameras, FÍSVOR and event timing should share a controlled operating layer.

11

Evidence + standards

Use the current ICU safety rules and event rules for the applicable discipline; exact floor/equipment and building evidence remain separate.

12

Maintenance + lifecycle

Inspect seams, mats/sprung floor, training aids, sound/scoring, lighting and storage/handling systems.

EVIDENCE LADDER

Do not collapse different kinds of evidence into one “approved” claim.

01

Official rule / governing reference

Defines the sport or competition requirement. It does not automatically approve a supplier or construction detail.

02

Product test / approval

Applies to an exact surface, equipment item or system configuration and the scope stated by the governing programme.

03

Installed facility test / certification

Where the sport offers it, field/court/facility testing confirms the finished installation rather than only the product.

04

Project engineering

Foundations, supports, wind/seismic loads, electrical, building interfaces and local-code compliance remain project-specific.

05

Commercial release

Warranty, documentation, spares, freight, installation responsibility and exact quoted configuration are closed before order.

SPECIFICATION INPUTS

Information a useful cheer & performance specification should contain.

These inputs can become a consultant brief, RFP schedule or Apollo project review without prematurely inventing an exact model.

01

Cheer / performance discipline

02

Training / competition use

03

Floor dimensions

04

Floor / impact system

05

Clear height

06

Warm-up / holding areas

07

Lighting

08

Audio / scoring

09

Spectators

10

Storage

11

Adaptive/inclusive requirements

PERFORMANCE-SPECIFICATION STARTERS

Clause intent that can be developed into the project specification.

These are performance-based starting points, not a substitute for the project architect, engineer, governing body or exact selected-system data.

01 · GEOMETRY

Playing environment

Define the exact cheer/performance discipline, floor size, boundary, warm-up and team holding areas from the current event brief.

02 · PLAYING SYSTEM

Surface performance

Competition/training floors may use different sprung, mat or performance-surface systems; impact and joint stability need to match the discipline.

03 · EVIDENCE

Evidence and approvals

Use the current ICU safety rules and event rules for the applicable discipline; exact floor/equipment and building evidence remain separate.

04 · HANDOVER

Maintenance and lifecycle

Inspect seams, mats/sprung floor, training aids, sound/scoring, lighting and storage/handling systems.

DRAWING ROADMAP

Draw the interfaces that words usually miss.

Public planning diagrams can define intent. Exact fabrication, foundation, fixing and model drawings should follow only when the selected system is verified.

01

Performance-floor plan

02

Clear-height section

03

Floor build-up

04

Warm-up/team flow

05

Lighting plan

06

Spectator layout

07

Audio/scoring schematic

08

Storage plan

TECHNICAL DIAGRAM PACK

Cheer & Performance planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-CHEER-PERFORMANCE
SPORTCheer & Performance
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANCheer & PerformancePLAYING AREA16.8 m PLANNING ENVELOPE16.8 m PLANNING ENVELOPE12.8 × 12.8 m playing-area baselineBASISApproximate 12.8 × 12.8 m ICU Cup performance-floor reference with an editable 2 m conceptual operating allowance around …
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONPerformance-floor + clear-height sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYPerformance floor, landing response, lifts/tosses and overhead clearances
Cheer and performance facilities need a clear vertical volume, stable performance floor, warm-up zones, music/scoring and safe team/spectator circulation.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentCheer & PerformancePLAYING / PERFORMANCE CORE01
Performance floor
02
Warm-up / tumbling
03
Training aids
04
Floor / mat storage
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYMusic / PA · Scoring / judgingCOORDINATION NOTESPerformance perimeter · Team holding · Music / PA · Scoring / judgingFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

MAINTENANCE & LIFECYCLE

Make performance maintainable.

01Floor seams/surface

02Mats / sprung system

03Training aids

04Lighting

05Audio

06Scoring

07Storage

08Cleaning

TROUBLESHOOTING

Common symptoms worth investigating.

01

Floor gaps / movement

Review installation, joins and storage/handling.

02

Hard landing response

Inspect floor/mat system and replace damaged impact components.

03

Clear-height conflict

Review roof services/fixtures and discipline requirements.

04

Music/audio failure

Check playback, redundancy, cabling and operator setup.

05

Warm-up congestion

Review team flow, holding and performance-floor access.

06

Spectator encroachment

Strengthen barriers/circulation and event controls.

SPORTS PLANNING CALCULATORS

Turn early ideas into measurable planning inputs.

These are concept-planning tools—not engineering, certification, accessibility or photometric calculators. Every input is visible and editable so assumptions stay explicit.

Approximate 12.8 × 12.8 m ICU Cup performance-floor reference with an editable 2 m conceptual operating allowance around the performance area.

CALCULATOR 01

Facility footprint

16.8 × 16.8 mconcept precinct rectangle
282.2 m²concept footprint
1playing units
CALCULATOR 02

Surface planning quantity

163.8 m²playing-area total
173.7 m²planning quantity incl. allowance

This is area arithmetic only. Roll widths, tile modules, seams, line systems, perimeter details and manufacturer-specific waste factors can change the final order quantity.

CALCULATOR 03

Spectator concept

50seats per row concept
27 mapproximate row length

Not a code or sightline calculation. Final rows, aisles, vomitories, accessible positions, guards, rake and egress must be developed by the project team.

BUILDER 04

Lighting brief

01Confirm the sport and exact competition level.

02Define the playing area plus spectator, camera and officials zones.

03Coordinate luminaire locations with structure, roof services, poles and maintenance access.

04Control glare for players, officials and spectators.

05Confirm local electrical, emergency-lighting and spill-light requirements.

06Define training, match and reduced-energy operating modes where controls support them.

NEXT STEP

Carry the assumptions into the technical and specification workflow.

Floor size and safety/operating zones vary by cheer/performance discipline and event rules. Verify the current ICU event packet, warm-up, team holding and clear-height requirements before final design.

PRIMARY GOVERNING REFERENCES

Use Apollo to navigate the technical problem—then verify the rule at source.

We link to the governing organisation rather than republishing whole standards. Rules, manuals, approval lists and competition requirements change.

Reference review date: 4 October 2026. Governing-body content remains owned and controlled by the relevant organisation. Apollo's summaries are planning aids, not substitutes for the current official rules or local professional advice.

CITE THIS RESOURCE

Cheer & Performance Facility Technical Centre

Publisher
Apollo NZ Global
Edition
2026.1
Reviewed
4 October 2026

Apollo NZ Global. Cheer & Performance Facility Technical Centre. LUTHVAR Global Sports Technical Library, 2026.1. https://apollonzglobal.com/sports/cheer-performance/technical-centre

Technical reference & source policy

PROJECT-SPECIFIC REVIEW

Turn the technical reference into a controlled cheer & performance project brief.

Apollo remains supply-only. Local design, foundations, civil works, installation, statutory approvals and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included.

Start Cheer & Performance project brief