Community / education
School/community performance area with safe floor and supervised movement zones.
Start Project Brief
GLOBAL SPORTS TECHNICAL LIBRARY
INDOOR HALL · CHEER & PERFORMANCE TECHNICAL CENTRE
Cheer and performance facilities combine floor performance, tumbling/landing safety, clear height, team circulation, music/scoring and spectator/event operations. Training floors and competition floors should be planned around the relevant discipline rather than generic multipurpose-room assumptions.

INTERACTIVE FACILITY MAP
Select a layer to see why it matters. This is a conceptual coordination map—not a dimensioned court, field, structural or compliance drawing.
FACILITY LEVEL MATRIX
Do not copy elite-event requirements into every community project—or under-specify a competition venue from a school checklist.
School/community performance area with safe floor and supervised movement zones.
Club/academy hall with dedicated floor, tumbling/training systems and storage.
Competition-capable venue aligned to current ICU discipline and event requirements.
Major event hall with show floor, warm-up, spectators, audio, displays and professional operations.
12 TECHNICAL TOPICS
Each topic is part of the same facility. Changing one layer can affect several others, which is why product selection should follow the complete brief.
Define the exact cheer/performance discipline, floor size, boundary, warm-up and team holding areas from the current event brief.
Competition/training floors may use different sprung, mat or performance-surface systems; impact and joint stability need to match the discipline.
Mats, sprung systems, training aids, tumbling systems and music/event equipment require safe setup and storage.
Provide even visibility without glare in upward athlete sightlines and without camera flicker at events.
Separate performance/warm-up/team zones from spectators while maintaining clear event circulation and accessible viewing.
Clear height, roof services, rigging and floor/slab interface should be coordinated around lifts/tosses and equipment.
Ventilation, temperature, humidity and chalk/cleaning conditions affect comfort and floor performance.
Plan inclusive/adaptive participation and accessible spectator routes where the programme requires them.
Roll floors, mats, training aids, sound equipment and event furniture need large, nearby storage and safe handling.
Music playback, scoring/judging, cameras, FÍSVOR and event timing should share a controlled operating layer.
Use the current ICU safety rules and event rules for the applicable discipline; exact floor/equipment and building evidence remain separate.
Inspect seams, mats/sprung floor, training aids, sound/scoring, lighting and storage/handling systems.
EVIDENCE LADDER
Defines the sport or competition requirement. It does not automatically approve a supplier or construction detail.
Applies to an exact surface, equipment item or system configuration and the scope stated by the governing programme.
Where the sport offers it, field/court/facility testing confirms the finished installation rather than only the product.
Foundations, supports, wind/seismic loads, electrical, building interfaces and local-code compliance remain project-specific.
Warranty, documentation, spares, freight, installation responsibility and exact quoted configuration are closed before order.
SPECIFICATION INPUTS
These inputs can become a consultant brief, RFP schedule or Apollo project review without prematurely inventing an exact model.
Cheer / performance discipline
Training / competition use
Floor dimensions
Floor / impact system
Clear height
Warm-up / holding areas
Lighting
Audio / scoring
Spectators
Storage
Adaptive/inclusive requirements
PERFORMANCE-SPECIFICATION STARTERS
These are performance-based starting points, not a substitute for the project architect, engineer, governing body or exact selected-system data.
Define the exact cheer/performance discipline, floor size, boundary, warm-up and team holding areas from the current event brief.
Competition/training floors may use different sprung, mat or performance-surface systems; impact and joint stability need to match the discipline.
Use the current ICU safety rules and event rules for the applicable discipline; exact floor/equipment and building evidence remain separate.
Inspect seams, mats/sprung floor, training aids, sound/scoring, lighting and storage/handling systems.
DRAWING ROADMAP
Public planning diagrams can define intent. Exact fabrication, foundation, fixing and model drawings should follow only when the selected system is verified.
TECHNICAL DIAGRAM PACK
Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.
These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.
MAINTENANCE & LIFECYCLE
01Floor seams/surface
02Mats / sprung system
03Training aids
04Lighting
05Audio
06Scoring
07Storage
08Cleaning
TROUBLESHOOTING
Review installation, joins and storage/handling.
Inspect floor/mat system and replace damaged impact components.
Review roof services/fixtures and discipline requirements.
Check playback, redundancy, cabling and operator setup.
Review team flow, holding and performance-floor access.
Strengthen barriers/circulation and event controls.
SPORTS PLANNING CALCULATORS
These are concept-planning tools—not engineering, certification, accessibility or photometric calculators. Every input is visible and editable so assumptions stay explicit.
Approximate 12.8 × 12.8 m ICU Cup performance-floor reference with an editable 2 m conceptual operating allowance around the performance area.
This is area arithmetic only. Roll widths, tile modules, seams, line systems, perimeter details and manufacturer-specific waste factors can change the final order quantity.
Not a code or sightline calculation. Final rows, aisles, vomitories, accessible positions, guards, rake and egress must be developed by the project team.
01Confirm the sport and exact competition level.
02Define the playing area plus spectator, camera and officials zones.
03Coordinate luminaire locations with structure, roof services, poles and maintenance access.
04Control glare for players, officials and spectators.
05Confirm local electrical, emergency-lighting and spill-light requirements.
06Define training, match and reduced-energy operating modes where controls support them.
NEXT STEP
Floor size and safety/operating zones vary by cheer/performance discipline and event rules. Verify the current ICU event packet, warm-up, team holding and clear-height requirements before final design.
PRIMARY GOVERNING REFERENCES
We link to the governing organisation rather than republishing whole standards. Rules, manuals, approval lists and competition requirements change.
Official ICU 2026 sport-of-cheer, performance-cheer and adaptive/special-abilities rule resources.
Open official sourceCompetition packet includes an approximately 12.8 × 12.8 m performance-floor reference and professional-grade surface requirement.
Open official sourceReference review date: 4 October 2026. Governing-body content remains owned and controlled by the relevant organisation. Apollo's summaries are planning aids, not substitutes for the current official rules or local professional advice.
CITE THIS RESOURCE
Apollo NZ Global. Cheer & Performance Facility Technical Centre. LUTHVAR Global Sports Technical Library, 2026.1. https://apollonzglobal.com/sports/cheer-performance/technical-centre
Technical reference & source policyPROJECT-SPECIFIC REVIEW
Apollo remains supply-only. Local design, foundations, civil works, installation, statutory approvals and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included.