Editable baselines
Reference dimensions are starting assumptions, not hidden constants.
Start Project Brief
SPORTS FACILITY PLANNING TOOLS
CONCEPT CALCULATORS · BRIEF BUILDERS · EXPLICIT ASSUMPTIONS
Use these planning tools to estimate multi-court footprints, surface areas and early spectator geometry, then generate a lighting brief. Every assumption stays visible and editable, and every result is clearly labelled as concept planning rather than engineering or certification.
Reference dimensions are starting assumptions, not hidden constants.
No result is presented as code compliance, certification, structural design or photometric design.
Copy the summary into the technical centre, spec pack or project brief.
SPORTS PLANNING CALCULATORS
These are concept-planning tools—not engineering, certification, accessibility or photometric calculators. Every input is visible and editable so assumptions stay explicit.
28 × 15 m playing court with 32 × 19 m minimum court-area reference used in the Apollo basketball technical centre.
This is area arithmetic only. Roll widths, tile modules, seams, line systems, perimeter details and manufacturer-specific waste factors can change the final order quantity.
Not a code or sightline calculation. Final rows, aisles, vomitories, accessible positions, guards, rake and egress must be developed by the project team.
01Confirm the sport and exact competition level.
02Define the playing area plus spectator, camera and officials zones.
03Coordinate luminaire locations with structure, roof services, poles and maintenance access.
04Control glare for players, officials and spectators.
05Confirm local electrical, emergency-lighting and spill-light requirements.
06Define training, match and reduced-energy operating modes where controls support them.
NEXT STEP
Use the exact competition brief for run-offs, seating, backstops and event overlays. The calculator does not replace FIBA venue guidance or architectural planning.
NEXT LEVEL
Concept calculations are useful because they expose assumptions early. They are not a substitute for governing rules, survey, engineering, accessibility, egress, civil design, lighting design or exact selected-system data.