A facility-level basketball reference for architects, clubs, schools, developers and venue operators. Use it to coordinate the court, floor, backstops, scoring, lighting, seating, building interfaces, storage and evidence before exact products are released.
PROJECT INTENT
Durable shared hall, teaching equipment, straightforward storage and community lighting.
Competition-style backstops, resilient sports floor, scoring, spectator and repeat changeover.
Exact equipment evidence, competition floor, shot clocks, scorer systems, lighting and controlled spectator layout.
Major seating, broadcast lighting, FÍSVOR video / scoring, media, high-clearance rigging and event operations.
TECHNICAL REQUIREMENTS
Coordinate the 28 × 15 m playing court, outer boundary, backstop position, team / scorer zones, player movement and the wider hall envelope. FIBA's venue guide uses 32 × 19 m as the minimum overall court area reference.
Compare approved wood, glass and synthetic pathways by competition level. Resolve slab flatness, moisture, sprung-floor construction, dead spots, rolling loads, temporary-event protection and humidity control.
Choose mobile, floor-fixed, wall-mounted or ceiling-mounted backstops from the building interface first. Then match boards, rings, nets, padding and shot-clock support to the exact system.
Coordinate horizontal and vertical illuminance, uniformity, glare, flicker, colour rendering and camera requirements. Competition/broadcast design should be based on the highest event level the venue intends to host.
Plan courtside seating, retractable banks, tiered sightlines, accessible viewing, circulation, team benches, scorer table and media positions together.
Check slab loads, anchors, wall reactions, roof / secondary steel, clear height, divider travel, lighting, ducts, sprinklers, scoreboards and rigging before equipment release.
Control direct sun, internal glare, temperature, humidity and water ingress. Wood and resilient systems can be permanently damaged by uncontrolled moisture.
Coordinate wheelchair viewing, accessible spectator routes, ramps to raised portable floors, player access and inclusive height-adjustable equipment where appropriate.
Show deployed and parked dimensions for backstops, portable floors, seating, divider curtains and event equipment. Door widths, thresholds and floor protection should be drawn, not assumed.
Coordinate scorer console, game clock, shot clocks, repeaters, FÍSVOR displays, power, data, cameras and venue control as one match-control layer.
Separate FIBA competition level, FIBA Approved Equipment, exact-model technical evidence and project-specific structural / local-code requirements.
Document daily cleaning, floor inspection, recoating/refinishing, equipment lubrication, fastener checks, padding condition, spare components, seating inspection and control-system testing.
PROJECT INPUT SCHEDULE
Competition level and governing requirement
Hall plan and clear height
Court / boundary geometry
Floor construction and slab information
Backstop family and storage route
Scoring / shot-clock / FÍSVOR scope
Lighting and broadcast target
Seating / accessibility / circulation
Divider and roof-service interfaces
Installation and local-engineering responsibilities
DRAWING & SUBMITTAL ROADMAP
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
EVIDENCE & RELEASE
Defines sport or competition requirements. It does not approve a supplier or local construction detail.
Testing, approval, certification or manufacturer evidence must match the selected product/configuration.
Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.
Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.
Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.
MAINTENANCE & HANDOVER
Court cleaning and slip-control regime
Humidity / moisture monitoring
Backstop and ring inspection
Padding and protection inspection
Shot-clock / scoring functional checks
Seating and guard inspection
Floor recoating / resurfacing planning
Critical spares register
TECHNICAL RISK CHECK
Check slab flatness, subfloor support, moisture damage and local floor deformation.
Check wheel condition, floor thresholds, route width, floor protection and operating procedure.
Review luminaire location/aiming, direct sun and reflective floor/display surfaces.
Check protocol, cabling, power, controller settings and exact product compatibility.
Check coating system, cleaning chemistry, event protection and maintenance cycle.
Recheck courtside obstructions, first-row position, riser geometry and spectator focal point.
PRIMARY GOVERNING REFERENCES
Venue-wide guidance for field of play, equipment, lighting, seating, operations and arena planning.
Outdoor court location, drainage, flooring, equipment and lighting guidance including 3×3.
SUPPLY BOUNDARY
Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.