Skip to main content
Apollo NZ Global

LUTHVAR · GLOBAL SPORTS TECHNICAL LIBRARY

Cheer & Performance
Facility Specification Pack

Cheer and performance facilities combine floor performance, tumbling/landing safety, clear height, team circulation, music/scoring and spectator/event operations. Training floors and competition floors should be planned around the relevant discipline rather than generic multipurpose-room assumptions.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERCheer & Performance Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/community performance area with safe floor and supervised movement zones.

02Clubs · academies · universities

Club / academy

Club/academy hall with dedicated floor, tumbling/training systems and storage.

03Regional · national competition

Competition

Competition-capable venue aligned to current ICU discipline and event requirements.

04International · professional · broadcast

Elite / major venue

Major event hall with show floor, warm-up, spectators, audio, displays and professional operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Define the exact cheer/performance discipline, floor size, boundary, warm-up and team holding areas from the current event brief.

02

surface

Competition/training floors may use different sprung, mat or performance-surface systems; impact and joint stability need to match the discipline.

03

equipment

Mats, sprung systems, training aids, tumbling systems and music/event equipment require safe setup and storage.

04

lighting

Provide even visibility without glare in upward athlete sightlines and without camera flicker at events.

05

spectators

Separate performance/warm-up/team zones from spectators while maintaining clear event circulation and accessible viewing.

06

structure

Clear height, roof services, rigging and floor/slab interface should be coordinated around lifts/tosses and equipment.

07

environment

Ventilation, temperature, humidity and chalk/cleaning conditions affect comfort and floor performance.

08

accessibility

Plan inclusive/adaptive participation and accessible spectator routes where the programme requires them.

09

storage

Roll floors, mats, training aids, sound equipment and event furniture need large, nearby storage and safe handling.

10

technology

Music playback, scoring/judging, cameras, FÍSVOR and event timing should share a controlled operating layer.

11

evidence

Use the current ICU safety rules and event rules for the applicable discipline; exact floor/equipment and building evidence remain separate.

12

lifecycle

Inspect seams, mats/sprung floor, training aids, sound/scoring, lighting and storage/handling systems.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Cheer / performance discipline

02

Training / competition use

03

Floor dimensions

04

Floor / impact system

05

Clear height

06

Warm-up / holding areas

07

Lighting

08

Audio / scoring

09

Spectators

10

Storage

11

Adaptive/inclusive requirements

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Performance-floor plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Clear-height section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Floor build-up

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Warm-up/team flow

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Spectator layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Audio/scoring schematic

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Storage plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Floor seams/surface

02

Mats / sprung system

03

Training aids

04

Lighting

05

Audio

06

Scoring

07

Storage

08

Cleaning

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Floor gaps / movement

Review installation, joins and storage/handling.

02

Hard landing response

Inspect floor/mat system and replace damaged impact components.

03

Clear-height conflict

Review roof services/fixtures and discipline requirements.

04

Music/audio failure

Check playback, redundancy, cabling and operator setup.

05

Warm-up congestion

Review team flow, holding and performance-floor access.

06

Spectator encroachment

Strengthen barriers/circulation and event controls.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

International Cheer Union 2026 Safety Rules

Official ICU 2026 sport-of-cheer, performance-cheer and adaptive/special-abilities rule resources.

ICU 2026 International Cheerleading Cup Rules

Competition packet includes an approximately 12.8 × 12.8 m performance-floor reference and professional-grade surface requirement.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project