01Start with the supporting base
Cracking, moisture, uneven levels, contamination, ponding and poor drainage can add preparation work before the sports surface is installed. On many refurbishment projects, base repair is a bigger variable than the finish material itself.
New-build courts should separate earthworks, slab or asphalt construction and drainage from the sports-surface supply so quotations can be compared on the same basis.
02Different surface families have different cost structures
Applied acrylic systems use on-site preparation and multiple coating layers. Roll systems add seams, adhesive or fixing strategy and handling. Modular surfaces add edge, expansion and base-interface requirements. Hardwood and engineered indoor systems add subfloor, moisture and resilient-support considerations.
The useful comparison is whole system, expected use and lifecycle rather than material thickness alone.
03Line marking, colour and graphics can affect the package
Single-sport courts are generally simpler than heavily shared multi-sport layouts. Additional colours, logos, zoning and overlapping line hierarchies require more project coordination and can add material or installation work depending on the surface system.
04Indoor and outdoor projects should not be priced as the same job
Outdoor surfaces must deal with UV, rain, drainage and temperature movement. Indoor surfaces can introduce moisture control, subfloor resilience, rolling loads, cleaning and multi-use hall requirements.
A surface selected only because its unit price is lower can become poor value if it does not match the operating environment.
05Supply-only and installed pricing need to be separated
New Zealand market pricing often combines product, base preparation and installation. Apollo's ATHREN pathway is primarily supply-focused, so local preparation, installation and civil work should be separated unless specifically included in writing.
Freight, unloading, storage and access also need to be included when comparing a locally installed quote with an imported product-supply package.
06Compare like-for-like flooring quotations
Ask whether each quotation includes the same playing area, waste allowance, transitions, line marking, underlay or shock pad, adhesives or fixing components, protective layers, documentation, packaging and delivery scope. A lower surface-only quotation is not necessarily a lower completed-facility cost.
For an arena, ask separately about specialist competition use, moving seating or equipment, protective coverings and maintenance closures. For a school, define the everyday sports programme and cleaning responsibility. The appropriate products are compared on the ATHREN sports-flooring system pages; the local work package is arranged independently.
07What Apollo needs for a sports-flooring cost review
The brief should identify the sport, area, substrate and operating environment before a surface family is priced.
- Sports and level of play
- Floor / court dimensions
- Existing base type and condition
- Indoor or outdoor environment
- Permanent, portable or staged installation
- Drainage and moisture conditions
- Line marking and colour requirements
- Expected maintenance and venue use
- New Zealand destination and access