Modular PP tiles
Interlocking tiles can support replaceability, modular installation and selected outdoor drainage pathways, but the exact tile construction and base still matter.
International Decision Centre / Global
Both can work well, but they solve different installation and operating problems.

Direct answer
Choose modular tiles when replaceable modules, open-joint drainage or modular installation matter. Choose roll flooring when a more continuous playing surface, specific indoor performance or event deployment is the stronger requirement.
Project decision
Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.
Interlocking tiles can support replaceability, modular installation and selected outdoor drainage pathways, but the exact tile construction and base still matter.
Continuous or sheet-style sports surfaces can suit indoor courts, portable tournament use or specialist performance needs depending on construction.
Neither format fixes a poor substrate. Flatness, movement, moisture, drainage and transitions need to be understood before product selection.
Comparison matrix
Use the matrix as a shortlist, then confirm the exact product.
| Factor | Modular PP tile | Roll flooring |
|---|---|---|
| Format | Interlocking modules | Continuous rolls / sheets |
| Replacement | Individual modules | Sections / rolls |
| Outdoor drainage | Often stronger pathway | Depends on system and base |
| Portability | Possible by system | Strong in selected event products |
| Visual seams | Module grid visible | Fewer seams |
Project brief
Frequently asked
No. Site conditions, scale, permanence, local works, operating expectations and documentation requirements change the right starting point.
No. Apollo uses a manual project-brief process so the selected system, quantities, destination, freight and project interfaces are checked before pricing.
Apollo is primarily a supply-only project-supply specialist. Local engineering, approvals, foundations, services, installation and other site work remain with the appointed local project team unless a written project scope states otherwise.
Next step
Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.