Floorball depends on the rink-board system and its operating logistics as much as the floor. This centre covers full and compact rinks, board movement/storage, goals, flooring, lighting and current IFF rules.

INTERACTIVE FACILITY MAP
Select a layer to see why it matters. This is a conceptual coordination map—not a dimensioned court, field, structural or compliance drawing.
FACILITY LEVEL MATRIX
Do not copy elite-event requirements into every community project—or under-specify a competition venue from a school checklist.
School/training rink with modular boards, safe goals and efficient storage.
Club hall with full rink, benches, scoreboard and repeat changeover.
Competition venue with exact IFF-marked equipment, lighting, team zones and event systems.
Major event hall with spectator seating, FÍSVOR, broadcast, media and professional changeover.
12 TECHNICAL TOPICS
Each topic is part of the same facility. Changing one layer can affect several others, which is why product selection should follow the complete brief.
Coordinate full or permitted smaller rink dimensions, rounded board corners, goal creases, team zones and spectator circulation.
Use flat, resilient indoor flooring suited to fast ball roll and repeated board installation; protect finish from board trolleys and events.
Rink boards, gates, corners, goals, nets, trolleys and benches need exact IFF marking/evidence where required.
Fast low ball movement needs even, low-glare lighting and clean sightlines.
Rink boards create a clear player boundary but spectator access, team benches and emergency paths still need coordinated openings.
Floor loading, board storage racks, divider systems, displays and roof services need hall-level planning.
Temperature and ventilation should maintain player comfort without condensation or unstable floor conditions.
Accessible spectator positions and circulation should be planned around rink gates and team zones.
A complete rink consumes substantial storage. Trolley dimensions, stack height, door width and route turns should be drawn.
Score/time, penalty clocks, FÍSVOR displays and PA should be coordinated with scorer and team zones.
The IFF Rules of the Game 2026 are valid from 1 July 2026; equipment marking/certification requirements remain exact-product specific.
Inspect board joints, gates, corners, trolley wheels, goals/nets, floor, scoreboard and storage racks.
EVIDENCE LADDER
Defines the sport or competition requirement. It does not automatically approve a supplier or construction detail.
Applies to an exact surface, equipment item or system configuration and the scope stated by the governing programme.
Where the sport offers it, field/court/facility testing confirms the finished installation rather than only the product.
Foundations, supports, wind/seismic loads, electrical, building interfaces and local-code compliance remain project-specific.
Warranty, documentation, spares, freight, installation responsibility and exact quoted configuration are closed before order.
SPECIFICATION INPUTS
These inputs can become a consultant brief, RFP schedule or Apollo project review without prematurely inventing an exact model.
Full/compact rink
Competition level
Floor
Board/gate system
Goals
Team/scorer zones
Lighting
Score/penalty clocks
Spectators
Storage/trolleys
PERFORMANCE-SPECIFICATION STARTERS
These are performance-based starting points, not a substitute for the project architect, engineer, governing body or exact selected-system data.
Coordinate full or permitted smaller rink dimensions, rounded board corners, goal creases, team zones and spectator circulation.
Use flat, resilient indoor flooring suited to fast ball roll and repeated board installation; protect finish from board trolleys and events.
The IFF Rules of the Game 2026 are valid from 1 July 2026; equipment marking/certification requirements remain exact-product specific.
Inspect board joints, gates, corners, trolley wheels, goals/nets, floor, scoreboard and storage racks.
DRAWING ROADMAP
Public planning diagrams can define intent. Exact fabrication, foundation, fixing and model drawings should follow only when the selected system is verified.
TECHNICAL DIAGRAM PACK
Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.
These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.
MAINTENANCE & LIFECYCLE
01Boards/joints
02Gates/corners
03Goals/nets
04Floor
05Trolleys
06Score/clock systems
07Lighting
08Storage racks
TROUBLESHOOTING
Inspect joints, floor flatness and damaged panels.
Review trolley loading order, route and crew sequence.
Check wheels/feet and floor protection.
Inspect hinges/latches and panel alignment.
Check configuration and controls.
Review floor/wall contrast and lighting.
SPORTS PLANNING CALCULATORS
These are concept-planning tools—not engineering, certification, accessibility or photometric calculators. Every input is visible and editable so assumptions stay explicit.
40 × 20 m full-rink reference with editable 2 m operational surround.
This is area arithmetic only. Roll widths, tile modules, seams, line systems, perimeter details and manufacturer-specific waste factors can change the final order quantity.
Not a code or sightline calculation. Final rows, aisles, vomitories, accessible positions, guards, rake and egress must be developed by the project team.
01Confirm the sport and exact competition level.
02Define the playing area plus spectator, camera and officials zones.
03Coordinate luminaire locations with structure, roof services, poles and maintenance access.
04Control glare for players, officials and spectators.
05Confirm local electrical, emergency-lighting and spill-light requirements.
06Define training, match and reduced-energy operating modes where controls support them.
NEXT STEP
The rink-board system and storage route are major facility inputs. Compact rink dimensions may be permitted for some levels; verify current IFF rules.
PRIMARY GOVERNING REFERENCES
We link to the governing organisation rather than republishing whole standards. Rules, manuals, approval lists and competition requirements change.
Reference review date: 4 October 2026. Governing-body content remains owned and controlled by the relevant organisation. Apollo's summaries are planning aids, not substitutes for the current official rules or local professional advice.
CITE THIS RESOURCE
Apollo NZ Global. Floorball Facility Technical Centre. LUTHVAR Global Sports Technical Library, 2026.1. https://apollonzglobal.com/floorball-systems/facility-technical-centre
Technical reference & source policyPROJECT-SPECIFIC REVIEW
Apollo remains supply-only. Local design, foundations, civil works, installation, statutory approvals and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included.