Floorball
Facility Specification Pack

Floorball depends on the rink-board system and its operating logistics as much as the floor. This centre covers full and compact rinks, board movement/storage, goals, flooring, lighting and current IFF rules.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERFloorball Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/training rink with modular boards, safe goals and efficient storage.

02Clubs · academies · universities

Club / academy

Club hall with full rink, benches, scoreboard and repeat changeover.

03Regional · national competition

Competition

Competition venue with exact IFF-marked equipment, lighting, team zones and event systems.

04International · professional · broadcast

Elite / major venue

Major event hall with spectator seating, FÍSVOR, broadcast, media and professional changeover.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Coordinate full or permitted smaller rink dimensions, rounded board corners, goal creases, team zones and spectator circulation.

02

surface

Use flat, resilient indoor flooring suited to fast ball roll and repeated board installation; protect finish from board trolleys and events.

03

equipment

Rink boards, gates, corners, goals, nets, trolleys and benches need exact IFF marking/evidence where required.

04

lighting

Fast low ball movement needs even, low-glare lighting and clean sightlines.

05

spectators

Rink boards create a clear player boundary but spectator access, team benches and emergency paths still need coordinated openings.

06

structure

Floor loading, board storage racks, divider systems, displays and roof services need hall-level planning.

07

environment

Temperature and ventilation should maintain player comfort without condensation or unstable floor conditions.

08

accessibility

Accessible spectator positions and circulation should be planned around rink gates and team zones.

09

storage

A complete rink consumes substantial storage. Trolley dimensions, stack height, door width and route turns should be drawn.

10

technology

Score/time, penalty clocks, FÍSVOR displays and PA should be coordinated with scorer and team zones.

11

evidence

The IFF Rules of the Game 2026 are valid from 1 July 2026; equipment marking/certification requirements remain exact-product specific.

12

lifecycle

Inspect board joints, gates, corners, trolley wheels, goals/nets, floor, scoreboard and storage racks.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Full/compact rink

02

Competition level

03

Floor

04

Board/gate system

05

Goals

06

Team/scorer zones

07

Lighting

08

Score/penalty clocks

09

Spectators

10

Storage/trolleys

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Rink plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Board/gate schedule

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Goal/crease plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Team/scorer layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Storage/trolley layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Changeover sequence

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Boards/joints

02

Gates/corners

03

Goals/nets

04

Floor

05

Trolleys

06

Score/clock systems

07

Lighting

08

Storage racks

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Board gaps/misalignment

Inspect joints, floor flatness and damaged panels.

02

Rink setup slow

Review trolley loading order, route and crew sequence.

03

Boards mark floor

Check wheels/feet and floor protection.

04

Gate sticks

Inspect hinges/latches and panel alignment.

05

Score clock errors

Check configuration and controls.

06

Ball visibility poor

Review floor/wall contrast and lighting.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

IFF Rules of the Game

Official 2026 Rules of the Game, valid from 1 July 2026.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project