AETREN AC
Commercial and destination charging for workplaces, residential developments, hospitality, venues and longer-dwell fleet parking.
Start AETREN BriefInternational commercial programme · Under qualification
AETREN is Apollo NZ Global’s project-led charging infrastructure brand for commercial developments, hospitality, sports and venues, infrastructure and fleet applications. Initial market development is focused outside New Zealand, with product release controlled by the certification and operating evidence available for each destination.
Application architecture
The charging system changes with dwell time, parking behaviour, power availability, operating model and destination. These pages structure the project before a model is selected.
Plan charging around dwell time, tenant and visitor use, parking allocation, electrical capacity and future growth rather than treating every bay as the same charging requirement.
Open pathway Hospitality & resortsHospitality charging should fit guest dwell time, arrival patterns, parking operations and the wider destination experience, with AC destination charging and selected faster charging reviewed as different use cases.
Open pathway Sports & venue projectsSports and venue car parks can combine long event dwell times, staff use, club activity and peak arrival periods. The charging plan should match those operating patterns rather than copy a retail or roadside model.
Open pathway Development & infrastructureFor larger residential, institutional, modular, remote and infrastructure projects, charging needs to be coordinated with the wider power, civil, parking and development strategy from the beginning.
Open pathway Fleet & commercial chargingFleet charging is driven by duty cycle, return-to-base time, vehicle utilisation, energy availability and uptime. Charger count and power should follow the operating schedule rather than headline output alone.
Open pathwayAETREN system architecture
These are system families, not claims about released models. Specific power ratings and configurations remain provisional until the corresponding product evidence is approved for public release.
Commercial and destination charging for workplaces, residential developments, hospitality, venues and longer-dwell fleet parking.
Fast-charging pathways for shorter dwell times, operational fleets, public-facing sites and strategic charging hubs.
Fleet and depot charging structured around duty cycle, vehicle utilisation, return-to-base windows and site power.
Multi-charger infrastructure where bay density, electrical capacity, access control and future expansion shape the project.
OCPP, communications, dynamic load management and site-control pathways where supported by the selected charger platform.
Reserved future pathway for project-specific charging, solar and battery integration once the underlying systems are fully qualified.
Technical release control
A charger can only move from programme development into a destination offer when the evidence supports the exact model and intended market.
Model-specific certification and issued evidence
Destination electrical and connector requirements
Ambient-temperature performance and thermal derating
OCPP / backend interoperability and site-management scope
Metering, RFID, payment and communications configuration
Warranty, support, spares and project documentation
AETREN project tools
The tools keep the project at system-family level until evidence supports an exact charger model.
AC versus DC, OCPP, load management, payment, thermal performance, compliance and local-work boundaries.
Open Technical Centre Project SelectorUse site type, bays, dwell time, turnaround, electrical capacity, access, backend and climate to identify the starting architecture.
Use Project Selector Project BriefCapture destination, users, charging behaviour, site power, controls, climate, programme and local electrical responsibilities.
Build Project BriefApollo supply scope
Apollo can coordinate the charger product, approved configuration, project documentation and agreed freight or delivery pathway.
Product selection, configuration review, supplier evidence control, technical documentation, manual quotation and supply coordination.
Electrical design, grid connection, civil works, protection, cabling, installation, commissioning, permits and local statutory approvals remain with the appointed project team unless expressly included in writing.