Fleet & commercial charging · International programme
EV charging for depots, service fleets and commercial vehicle operations.
Fleet charging is driven by duty cycle, return-to-base time, vehicle utilisation, energy availability and uptime. Charger count and power should follow the operating schedule rather than headline output alone.
Typical applications
Start with who parks here and how the site operates.
Service and maintenance fleets
Rental and mobility fleets
Commercial depots
Municipal and institutional fleets
Multi-site fleet programmes
Charging pathways
Different dwell times create different charging requirements.
Return-to-base AC
Overnight or shift-based charging where vehicles have predictable dwell periods.
Managed multi-charger sites
Load-balanced charging across larger fleets where simultaneous demand must be controlled.
Operational DC charging
Faster charging for high-utilisation vehicles, shorter turnaround windows or mixed-duty fleets.
Project brief
Information to establish before an exact charger is selected.
Vehicle types, battery sizes and daily energy use
Return-to-base dwell windows
Simultaneous charging demand
Load balancing and site maximum demand
Uptime, service and spare-parts strategy
Operator software, OCPP and reporting requirements
Release gate
The exact product remains provisional until its evidence fits the destination.
Public-facing power, certification, environmental and integration claims are only released against the selected platform and supporting documentation.
- Model-specific certification and issued evidence
- Destination electrical and connector requirements
- Ambient-temperature performance and thermal derating
- OCPP / backend interoperability and site-management scope
- Metering, RFID, payment and communications configuration
- Warranty, support, spares and project documentation
Scope boundary
Apollo coordinates the supply package. The local project team owns the site works.
Electrical design, grid connection, civil works, protection, cabling, installation, commissioning, permits and statutory approvals remain local responsibilities unless expressly included in a written project scope.