Interval load data
Use actual site demand and available-capacity data rather than the entered planning allocation.
Project BriefCapacity Planner · Scenario V2
This planning tool converts vehicle count, energy need, dwell time, simultaneous use, charger class and an entered charging-power allowance into a concept duty profile. It does not calculate network maximum demand, cable/protection sizes, transformer capacity or electrical compliance.
Operating + site assumptions
What to verify next
The project team should now close measured site capacity, vehicle compatibility, charger architecture, load management, backend, climate, payment/access and destination compliance.
Use actual site demand and available-capacity data rather than the entered planning allocation.
AC onboard limits, DC capability, connectors, duty cycle and future vehicle mix.
Define whether chargers share capacity dynamically and what priority/fairness rules apply.
Transformer/service, protection, earthing, isolation, harmonics and cable design remain local electrical work.
Ambient heat, direct sun, dust, salt and enclosure thermal behaviour can reduce usable output.
OCPP, payment/access, network failure behaviour, reporting, remote support and redundancy.
Evidence before release