One court, many sports
Identify the primary sport first. Check how basketball, netball, tennis, pickleball and general PE compete for court geometry, line marking and fixed equipment locations.
Ask about your project SCHOOLS & UNIVERSITIES
School courts must work at morning break, for PE, organised sport and often for community use after hours. Start with the sports mix and supervised use, then coordinate the surface, markings, equipment, containment, drainage, shade and maintenance.
Wholesale supply only · No on-site installation · Exact products and technical evidence reviewed by project
OUTDOOR SPORTS / SITE TO SUPPLYA good starting brief is about operation and site conditions, not prematurely committing to a flooring brand or court model.
These questions belong in the client, consultant and contractor brief. Product-level approval is a later stage.
Identify the primary sport first. Check how basketball, netball, tennis, pickleball and general PE compete for court geometry, line marking and fixed equipment locations.
Map entry/exit points, perimeter barriers, ball containment, accessible paths, storage, gathering zones and supervised use before fixing the playing surface.
Assess the existing asphalt or concrete, slope, movement, ponding, base condition and intended footwear. Applied systems and modular tiles require different substrate decisions.
Where clubs use a campus venue after hours, consider lighting, security, bookings, noise, access management and who maintains the facility.
These are planning examples—not fixed stocked packages or an installation quotation. Each system and destination must be checked separately.
A staged hardcourt refresh that protects the existing use programme.
Several activities connected by a common outdoor site plan.
Possibly. The installer must confirm structural soundness, drainage, flatness, moisture, movement and compatibility with the exact proposed surface system.
Yes, but the intended sport mix determines dimensions, marking hierarchy, fixed equipment, run-off spaces and safety arrangements. It needs to be planned rather than assumed.
No. Apollo supplies selected products and available product documentation. The school or project manager appoints qualified local contractors, engineers and installation teams.
Review ATHREN hard and cushioned acrylic, modular surface systems, LUTHVAR athletics project requirements and VETRAVA court configurations in one selection guide.
Each reference figure is clearly separated from the exact-model evidence, testing, site engineering and local installation requirements still to be confirmed.
Build a practical checklist of site information, drawings, engineering, surface evidence, installation responsibilities and supply documents. Select the sport, climate and facility systems to see what needs to be confirmed.
The checklist distinguishes buyer and local-team inputs from Apollo supplier submittals; it does not issue approvals.
You can start with the sport, approximate location and a short description. Our basic enquiry does not require measured drawings or a final specification.
Apollo NZ Global supplies products and available manufacturer documentation. Site survey, permits, engineering, groundworks, local installation, commissioning and competition-facility certification are not supplied unless a project agreement explicitly states otherwise.