Participation before product
Establish catchment, age mix, sports demand, accessible routes, safe gathering areas, nearby housing and operating hours before choosing a surface.
Ask about your project COUNCILS & PUBLIC RECREATION
Public recreation projects have to balance access, durability, budgets, inclusive use and long-term stewardship. Treat the court or field as one asset within a wider park or community network, with clear technical responsibilities.
Wholesale supply only · No on-site installation · Exact products and technical evidence reviewed by project
OUTDOOR SPORTS / SITE TO SUPPLYA good starting brief is about operation and site conditions, not prematurely committing to a flooring brand or court model.
These questions belong in the client, consultant and contractor brief. Product-level approval is a later stage.
Establish catchment, age mix, sports demand, accessible routes, safe gathering areas, nearby housing and operating hours before choosing a surface.
Compare replacement cycles, patch repair, vandal resistance, cleaning, spare parts and documented warranty conditions—not simply first supply cost.
Consider perimeter fencing, seating, shelters, lighting spill, signage, accessible amenities, cycle parking and emergency access as separate design interfaces.
Use performance-based specifications and model-specific evidence; record exclusions and local approval responsibility before tender or order.
These are planning examples—not fixed stocked packages or an installation quotation. Each system and destination must be checked separately.
A public court programme organised around broad participation.
Phased renewal across separate outdoor activity zones.
Yes. Apollo can review separate supply packages under one project brief, but design, consenting, electrical works, installation and local compliance remain with the appointed project team.
No. Playground and impact-attenuation performance must be supported by independent tests for the exact installed system and fall-height/application requirements.
Not necessarily. Product certification and finished-facility testing or certification are separate requirements.
Review ATHREN hard and cushioned acrylic, modular surface systems, LUTHVAR athletics project requirements and VETRAVA court configurations in one selection guide.
Each reference figure is clearly separated from the exact-model evidence, testing, site engineering and local installation requirements still to be confirmed.
Build a practical checklist of site information, drawings, engineering, surface evidence, installation responsibilities and supply documents. Select the sport, climate and facility systems to see what needs to be confirmed.
The checklist distinguishes buyer and local-team inputs from Apollo supplier submittals; it does not issue approvals.
You can start with the sport, approximate location and a short description. Our basic enquiry does not require measured drawings or a final specification.
Apollo NZ Global supplies products and available manufacturer documentation. Site survey, permits, engineering, groundworks, local installation, commissioning and competition-facility certification are not supplied unless a project agreement explicitly states otherwise.