Skip to main content
Apollo NZ GlobalStart This Brief

LUTHVAR COMPLETE · CLUB FOOTBALL

A competition-ready football ground built around the whole club operation.

A complete club-ground package designed around regular competition, training, spectators, changing facilities, match-day technology and long-term club operations.

Planning bandTypical planning band ~300–1,000 spectators before regional-venue infrastructure is usually worth comparing
Club Football Ground football facility concept

BEST FIT

Who this package is built around.

Football clubs · academies · universities · resorts · private sports developments

Established football clubs
Football academies
University sport
Resort / destination sports facilities
Private sports developments
Regional training bases

SITE ZONES

Plan the ground as connected operating zones.

The purpose is to expose interfaces early: players, spectators, lighting, maintenance, buildings and arrival all compete for space around the same field.

01

Main field

Competition field, goals, technical areas, run-offs and surface-maintenance access.

02

Team & officials

Home/away shelters, changing, officials, first aid / medical and secure player circulation.

03

Spectator side

Grandstand or seating, accessible viewing, optional SARENTA cover and match-day circulation.

04

Technology side

FÍSVOR scoreboard/display, PA, power/data routes and camera/streaming positions.

05

Performance zone

TORVYR strength/conditioning or outdoor training integrated with team operations.

06

Club support

Storage, clubroom/hospitality, administration, toilets and maintenance/operations areas.

SYSTEM STATUS

Core, optional and project-specific layers.

This keeps the package complete without forcing every venue to buy every module.

BOQ FRAMEWORK

What a complete supply schedule needs to account for.

This is a scope framework, not a priced bill of quantities. Final quantities, models, dimensions and responsibilities come from the project drawings and supplier evidence.

Competition field

  • Natural / synthetic surface system
  • Shockpad / infill where applicable
  • Line marking
  • Base / drainage interface
  • Maintenance plan
  • Field test / certification pathway where required

Match equipment

  • Competition goals
  • Nets + spares
  • Anchors / sockets
  • Corner flags
  • Training / small-sided goal options

Field perimeter

  • Spectator perimeter
  • High ball-stop
  • Maintenance gates
  • Player gates
  • Security / access interfaces

Lighting

  • Club-match lighting system
  • Poles / masts
  • Controls / dimming
  • Photometric design
  • Maintenance access
  • Power interface

Team & officials

  • Home bench / dugout
  • Away bench / dugout
  • Officials position
  • Medical / first-aid interface
  • Warm-up interface

Spectator package

  • Grandstand / seating
  • Accessible viewing
  • Rails / stairs
  • Optional SARENTA roof
  • Signage / wayfinding interface

Technology

  • FÍSVOR scoreboard
  • Match clock / scoring control
  • Optional video display
  • PA / club audio
  • Camera / streaming positions
  • Power / data routes

Club building

  • Home changing
  • Away changing
  • Officials changing
  • Toilets / showers
  • Storage
  • Office / administration
  • Clubroom / hospitality option

Performance & operations

  • TORVYR gym / outdoor training option
  • Field maintenance equipment
  • Storage racks
  • Critical spares
  • Match-day carts
  • Handover / manuals

STAGED DELIVERY

The venue can grow without losing the master plan.

For schools, clubs and councils, staging can preserve capital while keeping future seating, technology and building expansion coordinated.

01

Field & competition core

Surface, goals, perimeter, technical areas and field-operation requirements.

02

Match-day infrastructure

Lighting, team shelters, spectator seating, accessible viewing and basic FÍSVOR scoring.

03

Club building

Changing, officials, toilets, storage, administration and hospitality-ready support space.

04

Performance & event layer

Add TORVYR, SARENTA cover, HLJÓÐ, larger FÍSVOR and streaming / broadcast-ready interfaces.

EVIDENCE GATE

What must be closed before the package is commercially frozen.

  • Playing-surface evidence and any FIFA pathway matched to the exact selected system and finished field.
  • Competition goals matched to exact current model evidence.
  • Lighting level, photometric design, pole engineering, glare/spill and any FIFA requirement confirmed for the project.
  • Grandstand structure, seating, egress, accessibility and local approval responsibilities confirmed before order.
  • FÍSVOR display structure, brightness, viewing, control, power/data and weather requirements frozen.
  • Changing/building package coordinated with local structure, fire, accessibility, plumbing, electrical and consent requirements.
  • Local installation, civil works, foundations, commissioning and testing responsibilities identified line-by-line in the final scope.

EXPANSION PATH

Future growth can be designed in now.

Covered main standLarger FÍSVOR video displayHLJÓÐ distributed venue audioTORVYR full performance centreAcademy / secondary training pitchMedia / commentary areaRegional-event upgrade pathway

NEXT STEP

Turn this framework into a project-specific football-ground scope.

Use the dedicated brief to define the site, competition level, surface, spectator target, lighting, buildings, technology and the modules Apollo should coordinate.

Start Club Football Ground brief
Project