Multi-purpose sports spaces
Define sport mix, playing level, floor area, substrate moisture, line markings, protection from events and exact sport-performance documents required.

New Zealand / Cities / Hamilton
Hamilton's school, club, university and industrial projects share growing facilities needs but have very different product specifications. A school multi-use gym requires sport performance and subfloor review, while a warehouse fit-out requires opening schedules and operating-cycle evidence. Apollo can review both supply pathways against project drawings, receiving arrangements and the local design/installation team, without combining unrelated certification claims.
Apollo NZ Global operates a wholesale supply-only model. City guides do not indicate a local warehouse, local staff, installation, product-specific NZ building approval or confirmed freight price. Local engineers and contractors handle site design, consents, electrical work and installation.
Local buyers
Location-specific selection
Site conditions and the selected model's evidence determine suitability. A city page is not a structural calculation or certification.
Define sport mix, playing level, floor area, substrate moisture, line markings, protection from events and exact sport-performance documents required.
For industrial projects identify dimensions, movement frequency, dock interfaces, insulation, controls and local safety requirements before selecting a TREVIK system.
State whether the delivery is Hamilton urban, Cambridge or a regional site, with unloading equipment, site access, storage and locally appointed installer.
Product pathways
Check current model specifications and available documentation before requesting quotes or commissioning local installation.
Compare court surfaces against activities and base conditions.
Explore product rangeScope indoor or outdoor club and community courts.
Explore product rangeSpecify warehouse access systems from operational drawings.
Explore product rangeQuote-ready information
Hamilton/Waikato site and project purchaser
Court drawings or warehouse opening schedule
Surface/substrate or industrial duty-cycle evidence needs
Freight depot or receiving point, local installer and programme
Product supply, depot freight handover and available documents are agreed in the written quotation. All work on site is independently arranged.
Send this Hamilton project briefCommon project questions
Yes, when the school or club provides dimensions, sports, substrate, quantities and required evidence for review. Installation remains a separately contracted local activity.
No. These are separate product families with different performance, safety and installation documents.
More New Zealand locations