Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Request Project Pricing

LYSVAR · Architectural Glass Systems

LYSVAR DIVIDE

Interior Architectural Glass

Single- and double-glazed interior partition systems for offices, meeting rooms, hospitality, residential workspaces and selected public or commercial interiors.

LYSVAR DIVIDE Interior Architectural Glass architectural application

LYSVAR system · direct answers

What project teams need to know about LYSVAR DIVIDE.

The system family defines the application; final glass, fixing, loading and compliance remain project-specific.
01

What is LYSVAR DIVIDE?

Single- and double-glazed interior partition systems for offices, meeting rooms, hospitality, residential workspaces and selected public or commercial interiors.

02

Where is LYSVAR DIVIDE typically used?

Typical applications include Meeting rooms, Commercial offices, Hospitality interiors, Home offices, Education and administration. Final suitability depends on geometry, substrate, loading, exposure and local requirements.

03

What can be configured on a LYSVAR DIVIDE project?

Current capability includes Single-glazed partition pathways, Double-glazed partition pathways, With-muntin and without-muntin layouts, Full-glass and aluminium-framed door pathways, Falling-threshold door options in selected systems. Exact glass type, hardware, fixing and dimensions are confirmed against the project.

04

What information should Apollo receive before review?

Send drawings or dimensions, application, substrate and edge conditions, known loading or barrier requirements, exposure, destination and any relevant local compliance criteria.

05

What technical evidence has to match the exact LYSVAR configuration?

Catalogue capability is only the starting point. The project needs the glass specification, hardware and fixing details, structural / barrier loading basis, relevant product or system test evidence where required, corrosion / material grade information, and the approved project drawings to match the actual configuration. Acoustic, pool-safety, barrier and other regulated claims are not carried across from a different build-up or market by assumption.

06

Who confirms engineering and installation?

Apollo coordinates the supply pathway and product information. Final structural design, glass specification, installation and statutory compliance remain with the appropriate project professionals unless expressly included in the verified scope.

Office · hospitality · meeting · interior

Built around the application, not a generic glass catalogue.

The exact glass, hardware, fixing, loading, test evidence and compliance pathway is reviewed against the actual project and destination before quotation.

01

Single-glazed partition pathways

02

Double-glazed partition pathways

03

With-muntin and without-muntin layouts

04

Full-glass and aluminium-framed door pathways

05

Falling-threshold door options in selected systems

06

RAL colour pathways for aluminium profiles

Applications

Where LYSVAR DIVIDE fits.

Meeting roomsCommercial officesHospitality interiorsHome officesEducation and administrationReception and collaboration spaces

Project planning

Resolve the interfaces before the glass is ordered.

Glass systems are highly dependent on geometry, substrate, edge conditions and local code requirements. Early project information makes the supply review materially stronger.

01Partition plan and elevations
02Finished floor-to-ceiling height
03Door type and handing
04Acoustic target
05Single or double glazing
06Muntin / frame design intent
07Services and ceiling interfaces
08Fire / egress / accessibility requirements where applicable

System references

Use current product information as the starting point — then confirm the project.

The current range separates single- and double-glazed partition families and includes full-glass and framed door pathways.

Reference data includes acoustic-oriented configurations; project acoustic performance must be confirmed against current test evidence for the exact supplied build-up.

Final engineering, glass specification, structural loading, barrier / pool-safety requirements, installation and statutory compliance remain project- and destination-specific. Quotation is prepared manually.

Plan · specify · compare

Supporting pathways for LYSVAR DIVIDE Interior Architectural Glass.

Use the parent category, technical guidance and project tools to confirm application, evidence and supply requirements without creating duplicate search pages.
Product snapshot

LYSVAR DIVIDE Interior Architectural Glass

Interior glass-partition pathway covering single- and double-glazed systems, with-muntin and without-muntin layouts, full-glass and aluminium-framed door pathways and selected falling-threshold options. Current technical documentation includes acoustic-oriented systems for residential, office and meeting-room applications, but final acoustic claims require confirmation against current test evidence for the exact build-up. Fire, egress, accessibility and local fit-out requirements remain project-specific.

LYSVARInterior Glass PartitionsListed product pathway
Applications

Residential

Configuration

Project Configured

Materials

Aluminium · Glass

Environment

Indoor

TechnicalTechnical documents not yet centralisedDrawingsDrawing review by projectRegionalGlobal project reviewRelated1 controlled pathwaySupply modelSupply-only · manual project quotation

This snapshot summarises the current Apollo product record. Final configuration, interfaces, engineering, certification and destination requirements are confirmed against the project.

Project planning

Useful product details at a glance.

Product information
Project checkTechnical Review Required

Configuration, technical evidence, interfaces, exposure or destination requirements need product-specific review before the final supply package is confirmed.

Build project brief

Final engineering, testing, approvals and destination requirements are confirmed for the actual project where applicable.

Connected project pathway

Everything you need to take the next project step.

LYSVAR · Architectural Glass Systems
Planning & specification

LYSVAR DIVIDE Interior Architectural Glass: what to define before quotation.

Interior glass-partition pathway covering single- and double-glazed systems, with-muntin and without-muntin layouts, full-glass and aluminium-framed door…

Applications
  • residential projects
  • commercial projects
  • hospitality projects
  • international projects
Specification evidence
  • Verified product specifications or documented product facts
  • Clear applications, limitations and configuration boundaries
  • Project inputs required for manual quotation or technical review
  • Apollo supply-only scope and purchaser/local-project responsibilities
Compare before selecting
  • Dimensions, capacity or coverage required for the real site.
  • Materials, finishes and environmental exposure.
  • Installation, interfaces, services and maintenance access.
  • Technical documents, local approvals and project responsibilities.
Regional project pathwayLYSVAR Architectural Glass Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

BUILT INTELLIGENCE

Research connected to this project pathway.

Open Architecture & Specification

LYSVAR · Architectural Glass Systems

Send the drawings, dimensions and performance intent.

Request Project Pricing Explore all LYSVAR systems
Project