LYSVAR · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Coordinate pool/safety glass, balustrades, interior partitions and selected post-supported systems around geometry, glass build-up, hardware, fixings, structural/barrier loads, corrosion exposure, gates/doors, local safety requirements and exact-system evidence.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

LYSVAR family: EDGE, LINE, DIVIDE or specified-post pathway

02

Plans/elevations, glass runs, heights and openings

03

Pool/barrier/balustrade/partition application

04

Glass type/build-up and visual intent

05

Hardware, spigot/channel/post and fixing pathway

06

Substrate, edge condition and available fixing depth

07

Barrier/loading, gate/door and accessibility requirements

08

Coastal/corrosive exposure, destination and local compliance criteria

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact glass type, thickness/build-up and safety-glass evidence

02

Exact hardware/material grade and corrosion evidence

03

Fixing/anchor/channel/spigot details for selected system

04

Structural/barrier load basis and project engineering where required

05

Pool-safety/gate evidence tied to exact destination where applicable

06

Acoustic/fire/privacy evidence only where exact build-up supports it

07

Approved shop drawings, tolerances, packaging and warranty

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Architectural glass concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

System family/application

02

Glass build-up and finish

03

Hardware/fixing system

04

Structural/barrier loading

05

Pool-safety/gate requirements where applicable

06

Substrate and edge conditions

07

Coastal/corrosion requirements

08

Shop drawings/site measurement/installation boundary

09

Evidence, warranty and maintenance

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Glass-system schedule

02

Plans/elevations/dimensions

03

Glass build-up/finish

04

Hardware/fixing schedule

05

Loading/barrier requirements

06

Gates/doors/openings

07

Exposure/destination requirements

08

Evidence/test schedule

09

Shop drawings/tolerances

10

Packing/installation/warranty

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Glass cleaning and inspection

02

Hardware/spigot/channel/post inspection

03

Fixing/anchor visual checks

04

Gate/hinge/latch maintenance

05

Seal/joint inspection

06

Coastal corrosion cleaning/inspection

07

Damage/chip/crack escalation

08

Replacement glass/hardware register

AUTHORITY GUIDES

Go deeper on the decisions that usually control the project.

These guides sit below the owner page and above exact product selection, so search, specification and project planning all point to the same technical logic.

01

Pool and safety glass system selection.

Plan frameless pool and safety glass around barrier geometry, gates, glass build-up, hardware, fixing substrate, edge conditions and destination requirements.

Read guide
02

Frameless glass balustrade planning.

Plan frameless glass balustrades around loading, glass build-up, base-shoe or fixing system, edge conditions, handrails, drainage, tolerances and local engineering.

Read guide
03

Coastal glass hardware and corrosion planning.

Plan architectural glass hardware for coastal and salt-exposed projects around material grade, finish, drainage, crevices, cleaning, fasteners and maintenance.

Read guide

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.

Project