LYSVAR family: EDGE, LINE, DIVIDE or specified-post pathway
LYSVAR · PROJECT AUTHORITY CENTRE
Move from product interest to a controlled project specification.
Coordinate pool/safety glass, balustrades, interior partitions and selected post-supported systems around geometry, glass build-up, hardware, fixings, structural/barrier loads, corrosion exposure, gates/doors, local safety requirements and exact-system evidence.
01 · PROJECT INPUTS
Define the conditions before the exact system is released.
These inputs are deliberately upstream of model selection so the product does not dictate the brief.
Plans/elevations, glass runs, heights and openings
Pool/barrier/balustrade/partition application
Glass type/build-up and visual intent
Hardware, spigot/channel/post and fixing pathway
Substrate, edge condition and available fixing depth
Barrier/loading, gate/door and accessibility requirements
Coastal/corrosive exposure, destination and local compliance criteria
02 · EVIDENCE CONTROL
Keep project claims attached to what the evidence actually proves.
Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.
Exact glass type, thickness/build-up and safety-glass evidence
Exact hardware/material grade and corrosion evidence
Fixing/anchor/channel/spigot details for selected system
Structural/barrier load basis and project engineering where required
Pool-safety/gate evidence tied to exact destination where applicable
Acoustic/fire/privacy evidence only where exact build-up supports it
Approved shop drawings, tolerances, packaging and warranty
03 · CAD / DRAWING REGISTER
Planning references are not exact-system construction drawings.
Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.
| Resource | Status | Purpose |
|---|---|---|
| Architectural glass concept / planning layout | Public planning | Early scope, interface and consultant coordination only. |
| Generic technical reference / typical detail | Public planning | Explains system logic without representing an exact supplied configuration. |
| Exact-system GA / dimensional drawing | Exact-system | Issued only after the quoted system/configuration is known. |
| Native CAD / DWG / DXF | Verify availability | Availability and revision must be confirmed against the exact supplied system. |
| BIM / Revit / IFC object | Verify availability | Only described as BIM where a genuine verified native model exists. |
| Foundation / fixing / setting-out drawing | Project-specific | Depends on site/building conditions, local engineering and the selected system. |
| Services / electrical / controls interface | Project-specific | Coordinates the supplied system with local power, data, water, drainage or controls. |
04 · SPECIFICATION STARTER
Write the project around performance, interfaces and evidence.
These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.
System family/application
Glass build-up and finish
Hardware/fixing system
Structural/barrier loading
Pool-safety/gate requirements where applicable
Substrate and edge conditions
Coastal/corrosion requirements
Shop drawings/site measurement/installation boundary
Evidence, warranty and maintenance
05 · TENDER / RFP SCHEDULE
Ask bidders for the same controlled information.
A consistent schedule makes technical comparison easier and reduces hidden assumptions.
Glass-system schedule
Plans/elevations/dimensions
Glass build-up/finish
Hardware/fixing schedule
Loading/barrier requirements
Gates/doors/openings
Exposure/destination requirements
Evidence/test schedule
Shop drawings/tolerances
Packing/installation/warranty
06 · OPERATIONS & HANDOVER
Specify how the system will be maintained after delivery.
Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.
Glass cleaning and inspection
Hardware/spigot/channel/post inspection
Fixing/anchor visual checks
Gate/hinge/latch maintenance
Seal/joint inspection
Coastal corrosion cleaning/inspection
Damage/chip/crack escalation
Replacement glass/hardware register
AUTHORITY GUIDES
Go deeper on the decisions that usually control the project.
These guides sit below the owner page and above exact product selection, so search, specification and project planning all point to the same technical logic.
Pool and safety glass system selection.
Plan frameless pool and safety glass around barrier geometry, gates, glass build-up, hardware, fixing substrate, edge conditions and destination requirements.
Read guideFrameless glass balustrade planning.
Plan frameless glass balustrades around loading, glass build-up, base-shoe or fixing system, edge conditions, handrails, drainage, tolerances and local engineering.
Read guideCoastal glass hardware and corrosion planning.
Plan architectural glass hardware for coastal and salt-exposed projects around material grade, finish, drainage, crevices, cleaning, fasteners and maintenance.
Read guideDOWNLOADABLE PROJECT RESOURCE
Carry the authority pack into the project file.
Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.