LYSVAR · SPECIFICATION STARTER
Architectural Glass Systems
Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
LYSVAR
Architectural Glass Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- LYSVAR family: EDGE, LINE, DIVIDE or specified-post pathway
- Plans/elevations, glass runs, heights and openings
- Pool/barrier/balustrade/partition application
- Glass type/build-up and visual intent
- Hardware, spigot/channel/post and fixing pathway
- Substrate, edge condition and available fixing depth
- Barrier/loading, gate/door and accessibility requirements
- Coastal/corrosive exposure, destination and local compliance criteria
PERFORMANCE / SPECIFICATION CLAUSES
- System family/application
- Glass build-up and finish
- Hardware/fixing system
- Structural/barrier loading
- Pool-safety/gate requirements where applicable
- Substrate and edge conditions
- Coastal/corrosion requirements
- Shop drawings/site measurement/installation boundary
- Evidence, warranty and maintenance
REQUIRED EVIDENCE / SUBMITTALS
- Exact glass type, thickness/build-up and safety-glass evidence
- Exact hardware/material grade and corrosion evidence
- Fixing/anchor/channel/spigot details for selected system
- Structural/barrier load basis and project engineering where required
- Pool-safety/gate evidence tied to exact destination where applicable
- Acoustic/fire/privacy evidence only where exact build-up supports it
- Approved shop drawings, tolerances, packaging and warranty
DRAWING / CAD / BIM REGISTER
- Architectural glass concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- Glass-system schedule
- Plans/elevations/dimensions
- Glass build-up/finish
- Hardware/fixing schedule
- Loading/barrier requirements
- Gates/doors/openings
- Exposure/destination requirements
- Evidence/test schedule
- Shop drawings/tolerances
- Packing/installation/warranty
OPERATIONS / MAINTENANCE / HANDOVER
- Glass cleaning and inspection
- Hardware/spigot/channel/post inspection
- Fixing/anchor visual checks
- Gate/hinge/latch maintenance
- Seal/joint inspection
- Coastal corrosion cleaning/inspection
- Damage/chip/crack escalation
- Replacement glass/hardware register
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.
NEXT STEP