Opening geometry first
Width, height, guide spacing, headbox support and the stiffness of the surrounding structure all affect the final configuration.
International Decision Centre / Global
Wind performance is not a generic category claim. The opening, guide system, fixing structure, fabric, controls and operating rules all affect how an outdoor blind should be selected.

Direct answer
Start with the actual site wind exposure and opening geometry, then confirm the exact blind system's documented limits. Do not assume that a guided blind is suitable for every exposed opening simply because it has side retention.
Project decision
Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.
Width, height, guide spacing, headbox support and the stiffness of the surrounding structure all affect the final configuration.
A blind may need to be raised above a project-specific wind threshold. Controls, sensors and operator procedures should match the exact selected system.
Apollo should rely only on wind-performance information that can be tied to the exact blind model, size and supporting documentation.
Comparison matrix
Treat each row as a project question to close before quotation.
| Check | Why it matters | What to provide |
|---|---|---|
| Opening size | Load changes with geometry | Clear width and height |
| Site exposure | Wind demand varies by site | Location, photos, exposure notes |
| Guides / fixings | Retention depends on support | Column / wall / beam information |
| Controls | Operating strategy affects risk | Manual / motor / sensor preference |
Project brief
Frequently asked
No. Site conditions, scale, permanence, local works, operating expectations and documentation requirements change the right starting point.
No. Apollo uses a manual project-brief process so the selected system, quantities, destination, freight and project interfaces are checked before pricing.
Apollo is primarily a supply-only project-supply specialist. Local engineering, approvals, foundations, services, installation and other site work remain with the appointed local project team unless a written project scope states otherwise.
Next step
Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.