Outdoor exposure
Rain, UV, heat, cold, debris and standing-water risk make base preparation and drainage inseparable from the surface choice.
International Decision Centre / Global
The sport may be the same, but the environment changes the surface, base, drainage, weathering and maintenance requirements.

Direct answer
Outdoor surfaces need to manage UV, rain, temperature movement, drainage and contamination while maintaining suitable traction. Indoor surfaces can prioritise sport feel, acoustics, comfort and controlled-environment performance because rain and direct weather are removed.
Project decision
Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.
Rain, UV, heat, cold, debris and standing-water risk make base preparation and drainage inseparable from the surface choice.
Indoor facilities can focus more strongly on sport response, comfort, acoustics, rolling loads, cleaning and transitions to surrounding floors.
A surface suitable indoors is not automatically suitable outdoors, and the same product family may use different construction or preparation by environment.
Comparison matrix
Use this as an early project-screening matrix. Final suitability depends on the exact system, site, configuration and project requirements.
| Factor | Indoor | Outdoor |
|---|---|---|
| Weather | Controlled | Rain / UV / temperature exposed |
| Drainage | Building-floor strategy | Critical site / base issue |
| UV resistance | Lower relevance | Important |
| Comfort / acoustics | Often high priority | Balanced with weather durability |
| Base condition | Flat / dry / compatible | Stable + drained + weather-tolerant |
Project brief
Frequently asked
No. The useful choice depends on the project outcome, site conditions, scale, local work, operating expectations, maintenance and required technical evidence.
No. Apollo uses a manual project-brief and quotation process so product family, quantity, destination, freight, configuration and project interfaces are reviewed before pricing.
Apollo is primarily supply-only. Local engineering, approvals, foundations, services, installation and other site work remain with the appointed local project team unless a written scope states otherwise.
Next step
Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.