RHELGAN · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Turn a programme requirement into an auditable supply package across housing, WASH, water, power, health, education, community infrastructure and recovery while keeping local engineering, donor requirements, installation and operations visible.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Country, programme owner and procurement/funding pathway

02

Population, household count or facility user demand

03

Housing / WASH / water / health / education / community building mix

04

Climate, hazards, site access and logistics constraints

05

Water source, wastewater pathway and daily demand assumptions

06

Power source, critical loads, backup strategy and electrical standard

07

Accessibility, safeguarding, public-health and local code requirements

08

Manufacturing phasing, freight, storage, installation and handover responsibilities

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact building/system technical datasheets and material schedules

02

Structural/fire/public-health evidence applicable to the selected system

03

Water, sanitation and treatment evidence tied to the exact equipment

04

Power/generator certification and exact component documentation

05

Factory QA, inspection, packing and traceability plan

06

Warranty, manuals, critical spares and operator training scope

07

Donor/agency/local statutory requirements recorded separately from product evidence

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Programme / community concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Programme outcomes and design population

02

Building and infrastructure performance criteria

03

Climate/resilience and hazard requirements

04

Water/WASH demand and service interfaces

05

Power and backup-power architecture

06

Accessibility and safeguarding interfaces

07

Documentation, QA and inspection requirements

08

Packing, freight, site receiving and phased rollout

09

Installation / commissioning / operator responsibility matrix

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Programme brief and destination

02

Site/masterplan information

03

Required buildings/infrastructure quantities

04

Performance and evidence requirements

05

Utility/service assumptions

06

Required drawings/submittals

07

Manufacturing/inspection programme

08

Packing and logistics strategy

09

Warranty, spares, manuals and training

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Asset register by building/system

02

Routine WASH and water-system inspection

03

Generator/power maintenance schedule

04

Consumables and critical spare-parts register

05

Cleaning, hygiene and public-health routines

06

Defect logging and warranty escalation

07

Operator manuals / competency records

08

Periodic review against changing programme demand

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.