Programme requirement
Population, duration, intended service level, funding/procurement framework and destination requirements.
Upload RFP / DocumentsTechnical Library · Development & Humanitarian Systems
RHELGAN now brings housing, WASH, water, power, health, education, community infrastructure, recovery and complete-community planning into one controlled technical library. The objective is not to sell isolated modules; it is to make interfaces, evidence, logistics, local responsibilities and long-term maintainability visible before procurement.
Programme families
Every pathway leads into its own technical material where available. Final engineering, approvals, utilities, local works and programme governance remain project-specific.
Permanent, longer-life, transitional and recovery housing pathways, standard configurations and community-scale programmes.
Open pathway 02Toilets, showers, accessible amenities, mobile hygiene and project-configured sanitation systems.
Open pathway 03Modular water storage, community supply, rainwater, pumping, treatment pathways and operations planning.
Open pathway 04Generator, ATS, mobile, weatherproof, containerised, parallel and hybrid-support project pathways.
Open pathway 05Clinic, first-aid and community-health building pathways with sanitation, power and support interfaces.
Open pathway 06Classrooms, training buildings, amenities, teacher housing, recreation and essential project services.
Open pathway 07Community halls, administration, public amenities, hydration, recreation and supporting shared facilities.
Open pathway 08Housing, social infrastructure, water, sanitation, power and public systems coordinated from one programme brief.
Open pathway 09Durable reconstruction and resilience pathways rather than short-life emergency-product catalogues.
Open pathwayProject intelligence
The tools below keep programme planning, product selection, technical validation and supply responsibilities connected instead of fragmenting them across separate product enquiries.
Evidence model
RHELGAN should be useful to procurement teams without pretending product documents replace the project’s professional and statutory controls.
Population, duration, intended service level, funding/procurement framework and destination requirements.
Configuration, dimensions, materials, utilities, manuals, warranties and current product evidence.
Foundations, structure, services, civil works, site drainage, access and climate-specific engineering.
Permits, public-health rules, accessibility, electrical/plumbing requirements and destination approvals.
Packing, freight, lifting, site receipt, spares, commissioning responsibilities and O&M information.
Cleaning, inspection, consumables, service access, replacement parts and local maintenance capability.
Start at programme level
The programme selector is the fastest way to route a new requirement into the correct RHELGAN pathways.